41 种 porridge practice learned to warm a loved one's stomach it -
-
vegetable beef congee -
vegetable beef congee -
ingredients: beef - 40 grams, rice - 1 / 4 bowl, spinach - 1, broth - 1 / 2 cup potatoes, carrots, onion - 1 / 5 -
, salt - several -
Method (1) to prepare meat and ground beef. -
(2) spinach, carrots, onions, and mashed potatoes Dunshu. -
(3) the rice, vegetables and minced meat into the pot boil, and salt seasoning. -
02 tofu porridge -
ingredients: rice - 1 / 6 bowl, broth - 1 / 2 cup tofu 1 / 10, salt - several -
system of law (1) tofu cut into small pieces. -
(2) the rice, broth, tofu pot of water on the cook. -
(3) cook until thick, when adding the right amount of salt. -
03 egg congee -
ingredients: egg - 1 / 2 carrot - 1 / 5, spinach - 1, rice - 1 / 4 bowl, broth - 1 / 2 cup, salt - several -
system of law (1) Dunshu chopped carrots and spinach. -
(2) the rice, broth and chopped carrots, spinach into the pot and cook. -
(3) after the boil and stir into the batter chopped open, seasoning with salt. -
04 vegetables and fish porridge -
ingredients: fish, white meat - 30 grams, carrots - 1 / 5, kelp broth - 1 / 2 cup carrot - 20 grams of soy sauce - a number, m -
rice - 1 / 4 bowl -
system of law (1) tick the net the fish bones, fish and mashed Dunshu. -
(2) the radish, carrots with a good eraser wiping dishes. -
(3) the rice, seaweed soup and meat, cook vegetables into the pot. -
(4), when placed in soy sauce and cook until thick. -
-
cheese porridge -
-
05 cheese porridge -
ingredients: rice - 1 / 6 bowls of water - 1 / 2 cup cheese - 5 grams -
system of law (1) cheese chopped. -
(2) wok, add the appropriate amount of boiled rice. -
(3) into the cheese and cook until thick, when the, when the cheese started to melt off the fire. -
06 peas porridge -
ingredients: rice - 1 / 4 bowl, peas - 5, milk - 1 / 4 cup salt - several -
system of law (1) peas cooked with water, mashed and filtered. -
(2) in the rice, add water to boil with the pot. -
(3) into the milk and after the peas, and cook the mixture gently. -
(4) salt to taste. -
07 walnut porridge -
ingredients: rice - 1 / 3 cup walnuts - 5, red dates - 1, salt - several -
system of law (1) nutcracker to open the flesh removed, soaked in water, stripped of their thin-skinned and mashed. -
(2) the red dates and water soaked mashed. -
(3) the walnuts, dates, rice add water on a small pot. -
(4) cooked with salt to taste. -
08 apple porridge -
ingredients: rolled oats - 3 tablespoons milk - 1 / 4 cup apple - 1 / 6, carrots - 1 / 3 -
system of law (1) Wash the apples and carrots and use a good eraser wiping dishes. -
(2) would be a good oatmeal and rub 1 tablespoon carrot into the pot, pour the milk and 1 / 4 cup of water simmer. (3) cook -
open and then rub well into the 2 tablespoons of apple until boiled. -
-
taro porridge -
09 fish, milk porridge -
ingredients: fish, white meat - 1 / 6, Milk - 1 tablespoon salt - several -
system of law (1) fish lift drop-clean, Dunshu and mashed. -
(2) to Riga pot of milk on the cooked fish, then season with salt. -
-
10 taro porridge -
material: Taro - 1 / 2, broth - 1 tablespoon soy sauce - some -
system of law (1) taro skin peeled cut into small pieces, then wash with salted look. -
(2) after the mashed taro Dunlan and filter. -
(3) the broth and taro on the small pot, stirring from time to time to look at. -
(4), add soy sauce and cook until thick. -
11 potato porridge -
raw materials: potatoes - 1 / 3 milk - 2 tablespoons of cooked egg yolk - 1 / 4, Salt - Some -
system of law (1) potatoes, peeled, Dunlan, mashed and filtered. -
(2) will Simmer potatoes with milk, and stir gently, after a thick salt. -
(3) the egg yolks mashed potatoes on the mud. -
12 cheese bread, porridge -
material: staple bread - 1, milk - 2 / 3 cup cheese powder - 1 / 2 spoon -
system of law (1) the edge of the staple food, bread torn to pieces after the cut. -
(2) pieces of bread and milk to simmer, cook paste, sprinkled with cheese powder. -
cake can also be used to make cakes instead of bread and porridge. -
-
tomato porridge -
13 carrots yogurt porridge -
ingredients: carrot --1/10 of flour - 1 tsp, cabbage - 10 grams of yogurt - 1 tablespoon broth - 3 tablespoons yellow -
oil - a number -
system of law (1) to the cabbage and carrots into filaments Dunlan. -
(2) stir fry with butter to flour look, add broth, cooked vegetables, and light stir. -
(3) cooling the material after a good stew marinated with yogurt -
14 tomato porridge -
ingredients: tomatoes - 1 / 8, rice - 1 / 4 bowl, kelp broth - 1 / 2 cup, salt - several -
system of law (1) tomatoes soaked in boiling water, then remove the peel to the flesh, chopped. -
(2) will be poured into the pot of rice and seaweed soup is cooking. -
(3) by adding cooked tomatoes, seasoned with salt. -
15 chicken porridge -
ingredients: chicken breast meat - 10 grams, rice - 1 / 4 bowl, kelp broth - 1 / 2 cup spinach - 10 grams of soy sauce, sugar - if -
dry -
system of law (1) to the tendons of the chicken breast meat, cut into small pieces, marinated with soy sauce and sugar look. -
(2) Dunshu and chopped spinach. -
(3) seaweed broth to cook rice with a bit, then add chicken and cook spinach. -
16 wakame red clam porridge -
ingredients: red clam - 2, dried wakame - 20 grams, rice - 1 / 4 cup -
system of law (1) red clam and wakame with water blisters open net after the twisted and chopped. -
(2) Mega will be soaked with the right amount of water poured into the grinding mill. -
(3) ratio of 1:10 will be fine rice and water, add wakame and red clam cook. -
(4) after the salt seasoning cooked. -
-
sweet potato egg congee -
17 eggs, sweet potato porridge -
ingredients: sweet potato - 1 / 6, egg - 1, milk - 2 tablespoons -
system of law (1) sweet potatoes peeled, Dunlan, and mashed. -
(2) after the eggs cooked mashed egg yolk. -
(3) sweet potato mud Simmer milk, stirring from time to time. -
(4) thick when placed in egg yolk, and stir well. -
18 chestnut porridge -
ingredients: chestnuts - 5, kelp broth - 1 / 2 cup -
system of law (1) chestnuts boiled, peeled, mashed. -
(2) seaweed broth to boil, add chestnuts and cook. -
chestnuts can be strong gastrointestinal function, helps digestion. Infant diarrhea eating chestnuts, better. -
19 vegetable porridge -
ingredients: beef - 20 grams, rice - 1 / 3 cup carrots, onions - some, sesame oil, soy sauce - some -
Method (1) Soak rice, washed well, beef, carrots, onions chopped. -
(2) with sesame oil and fry the beef in the pan, re-soaked the rice frying. -
(3) stir-fry until the rice to some extent by adding carrots and water, the mixture gently boiled, and then soy sauce. -
-
20 miso porridge -
ingredients: rice - 1 small bowl of miso - 1 / 2 tsp, carrots, onions, spinach - some -
system of law (1) carrots, onions, spinach, cut into pieces. -
(2) vegetables, add broth boils, then add rice and cook. -
(3) after amplification cooked sauce seasoning. -
-
-
lotus longan porridge -
-
21 carrot porridge -
materials: Prepare carrots (carrots) amount -
Production: Wash to remove the carrot roots steamed rice into the steamer and steam on the rotten remove let cool smashed into the mud -
If a child likes to eat sweets but also a little sugar -
Features: fragrance palatability carrot sweet nature with the power of the spleen to aid digestion and contains carotene B vitamins -
fat carbohydrate which contains a lot of pectin in children with convergence and diarrhea after eating adsorption can inhibit intestinal peristalsis -
inhibiting indigestion caused by diarrhea is very appropriate -
22 fillet porridge -
pork tenderloin is the pig back on the meat -
ancient times people have their sexual sweet as medicinal Xianping pork rich in protein and contain more carbohydrates -
compounds of calcium and phosphorus iron and other nutrients to prevent malnutrition -
raw materials: pork tenderloin 100 grams salt 100 grams of rice powder, a little sesame oil Chuanjiao -
Production: First pork tenderloin, cut into small pieces put the pan fried with sesame oil and then add rice porridge congee -
the overripe boil then add salt and pepper to taste Serve -
Features: porridge with oil and seasoning meaty taste great benefit of human children eat this porridge to prevent the occurrence -
anemia -
23. lotus seeds and longan porridge -
[materials] lotus 20 grams of longan meat 10 grams, 50 grams of rice. -
[practice] to take lotus seeds, longan meat, rice with congee. -
[usage] 2 times a day, hot food. -
[role] up Heart, benefit qi and blood. For blood loss anemia. -
[commentary] longan nourishing, not long use; seeds can not level up steep, you can Jiufu. Reading desk, labor sad spleen, impaired memory, Notani not fragrant, could eat lotus porridge. -
24. rice pudding -
[materials] Gorgon, barley rice, white beans, lotus, yam, red dates, longan, lily of 6 grams, 150 grams of rice. -
[practice] the first to take the eight drugs boiling 40 minutes, then add rice to boiled into porridge. -
[usage] sub ton transfer sugar consumption, ate a few days. -
[role] spleen and stomach, kidney qi, nourishing the nerves. For insomnia and fatigue physically weak puffy, diarrhea, thirst, cough with little phlegm. -
[commentary] supermarket selling rice pudding, taking better warm, healthy eating can be fit and healthy. -
-
-
Bozi porridge -
25. Bozi porridge -
[materials] Bozi 15 grams, 100 grams of rice, honey. -
[practice] first Bozi remove the skin, shell, impurities, mash, and rice porridge, porridge would be when blended with honey, can Shaozhu boil. -
[usage] twice daily for 3 days. -
[role] laxative, uneasiness of mind. For heart palpitations, insomnia, forgetfulness, constipation, chronic constipation or senile. -
[commentary] Bozi Gan Ping, uneasiness of mind, Yin Liver, spleen and intestines Shu, beauty black hair and so on. Bozi 14% fatty oil, a small amount of volatile oil, saponins and other substances, for the common tonic sedative drugs. -
26. Suanzaoren porridge -
[materials] Semen end of 15 grams, 100 grams of rice. -
[practice] before adding water to rice to be cooked porridge, cook for a moment to join the end of Semen. -
[usage] morning and evening, warm clothes. -
[role] to support the heart, nerves, sweating. For neurasthenia, heart palpitations, insomnia, dreams, black eye. -
[commentary] Semen end in sour and sweet taste buds into porridge, popular. Semen can be used raw with fried, scrambled for too often can damage the active ingredients. Desirable Suanzaoren Wei Chao moment into powder, the family used a rolling pin grinding. -
27. Zaoren millet porridge -
[materials] 100 grams of millet, Semen end of 15 grams, honey 40 grams. -
[practice] the millet porridge of water to be cooked, add Suanzaoren end, stir well boil. -
[usage] 2 times a day, honey, warm clothes. -
[role] Spleen moistening, Anshen. Hong attending food is not satisfied, restless sleep last night, dry stool. -
[commentary] Semen can Anshen, millet can Spleen Yang Xin. Wei Chao, a moment in the pot Suanzaoren powder, the family used a rolling pin grinding. -
28. mung bean porridge -
[materials] -
green beans 30g, rice 100g -
[practice] -
1. Green beans, rice washing clean. -
2. The mung bean, rice into pot, add water about 500g, cook until rice sticky juice when broken away from the fire can be eaten. Take 1-2 times daily. -
[Nutrition] -
containing protein 13.6g, Fat 0.65g, Carbohydrate 95.7g, Calcium 39mg, Phosphorus 25.9mg, Iron 2.7mg, Vitamin A0.20 international units of vitamin B10.2mg, vitamin B21.5mg, niacin 0.6mg , Nengchan hot 453kcal. -
[function] -
mung bean is a very good hot weather food, to heat summer heat, detoxify and eliminate pain, diuretic dehumidification, matched with rice, congee, but also spleen Qi, nourishing fluid, indeed the solution for the summer summer to share, and because the product is not too cold, cool the stomach the spleen is not stagnation, is the post-heatstroke, hot weather to share. -
-
-
honeysuckle porridge -
29. ginkgo porridge -
benefits strength, make up the five internal organs, anti-aging, elderly, infirm preferred. Eat normal fitness. The family should eat. -
practice: -
ginkgo benevolence (peeled blanched in boiling water to within the seed coat) 6-10 tablets, a small amount of crystal sugar, rice, 2 2, the amount of water, and into the pot, simmer and cook top. Minced into a paste with rice can be. -
Ginkgo should sugar and other light sweet rice class match, such as ginkgo rice pudding, green bean porridge ginkgo, ginkgo Adenophora lotus porridge, candy, rock sugar, white sugar is appropriate. -
30. honeysuckle porridge -
materials: 30 grams of honeysuckle, white rice 30 grams. -
practice: honeysuckle in medicine stores. Boiling water first, whichever is gravy, add white rice 30 grams, 300 milliliters of water, cook the thin porridge. -
effect: used to control heat stroke, and a variety of heat canker sores, sore throat, Fengreganmao and so on. -
31. lotus porridge -
material: Xianou 200 grams, 100 grams of rice, a little sugar. -
practice: first lotus root slices, and cook the rice porridge, porridge cooked, and then transferred to a little sugar, you can eat. -
effect: Qi Yin, spleen appetizer, the elderly, physically weak, hot days, loss of appetite, loose stools thin, fever, thirst, and so can eat. -
32. tremella porridge -
material: white fungus 60 grams, 100 grams of rice. -
practice: white fungus with water foaming wash. After scouring the net rice, into the pot and add water to a boil, then add the white fungus, boil congee, transferred some of the sugar Serve. -
Effects: Nourishing Yin fluid, lungs and stomach, qi and blood, can cure consumptive cough, bloody sputum, Yin thirsty. -
-
-
-
Ophiopogon bamboo porridge -
33. jujube porridge -
material: dates, rice, with its own flavor component can be determined. -
approach: simple, plain porridge cook until seven in the ripe, red dates into the cook. -
Effectiveness: raising the spleen, heart and lung Run, make up the five internal organs, the function of government wasting, for low blood pressure, cough, lung deficiency, there is a certain gain. -
34. Ophiopogon bamboo porridge -
material: Ophiopogon 30 grams, 10 grams of licorice, bamboo leaves 15 grams, 100 grams of rice, red dates 6 to the core. -
practice: the Radix, licorice root, bamboo leaves with water torture, juice, add rice, congee with red dates. -
effect: a little hint of sweet, hot weather with heat, qi and stomach and other effects, if the heat was thirsty, shortness of breath, fatigue, not eating, give it a try. -
35. milk porridge -
practice: bean paste amount, 50 grams of rice, along with porridge. -
effect: there lungs stomach, eliminate puffiness, under sewage, urine effect in the summer eat it can relieve summer heat, dampness, and for the treatment of summer loss of appetite, tired body fatigue Zhu Zheng. -
36. Mint porridge -
practice: 150 grams of rice congee, and the other with fresh mint mint 100 grams or 20 grams dry fry doctrinal soup, add the amount of sugar and pour it into the congee, mix after the cool clothes. -
effect: the treatment of summer Fengreganmao, headache, red eyes, itching, urticaria, sore throat embolism is very good. -
-
Chrysanthemum porridge -
37. chrysanthemum porridge -
approach: yellow chrysanthemum 20 grams, a little water to cook into chrysanthemum water to chrysanthemums, this water and 160 grams of rice congee. -
effect: This porridge Fengreganmao the summer, red eyes dim, treatment toxicity and high blood pressure sores are more appropriate. -
38. reed rhizome porridge -
practice: fresh reed rhizome 150 g, Zhuru 15 grams, 60 grams of rice, ginger 2, the reed rhizome washed, cut into sections, and Zhuru Tong Jian, to the residue add rice, ginger congee, 2 second take. -
effect: heat, except for the annoying, Sheng Jin, antiemetic efficacy for the treatment of heat stroke, thirst, nausea and vomiting. -
-
39. chicken congee -
Ingredients: chicken 200 g -
spices: diced green onion, 5 grams, 5 grams of salt, cooked oil, pepper, ginger 5 grams coriander. -
practice: -
1: washing clean the rice into pot, add water 2000 grams, boil low heat Chengyu -
2: chicken into another pot, add ginger and water, boil after a small fire cooked, remove and let cool, the shredded chicken, then diced green onion, salt, pepper , mature oil seasoning mix. -
3: to transfer a good taste of the chicken into the porridge pot, simmer Shaozhu while, sprinkled with coriander and serve. Shall, according to personal preferences and habits, not to add coriander. -
characteristics: taste delicious, eat it can nourish the internal organs, qi and blood. -
-
-
-
40. 皮蛋瘦肉粥 -
porridge Ingredients: lean meat, 1 (pig tendon meat is best), preserved eggs, 2 (Lead-free egg, a healthier, two lime flavor is not so large), ginger one, water in sufficient quantities, oil, salt and sugar. -
to cook a pot of fragrant delicious soft meat salty preserved egg congee, tips are as follows: -
(1) pick-meter: rice porridge with the best rice of northeast China, is just round ZhenZhuMi, cook the porridge especially soft; -
(2) to pre-salted rice porridge: about half a bowl of rice after washing clean, use 2 tablespoons oil, 1 teaspoon of salt and a little water (2 teaspoons) and mix well, marinate for at least half an hour , rest assured, though with a lot of oil, but oil will evaporate in the process of porridge, rice cotton so rotten, so it was not greasy; -
(3) porridge cooked with boiling water to cook the meat first fishy, or pickled into bacon: porridge with lean meat or meat marinated in salt, not too elegant a piece of meat of pigs which, in short, to maintain Do not cut a single piece of meat (I usually use about 1-2 cm thick palm-sized piece of pork, if conditions permit, with a pig tendon meat taste better). If you use lean meat porridge, then the first with boiling water to lean slightly -
boil for cooking, and then washed; if you like salty pork porridge with salt, then salt pork to marinate for a day in advance, as follows: -
pork one, rinse, pat dry, sprinkle 2-3 teaspoons of salt, spread evenly on the meat, the fridge in the lower compartment (fresh is not frozen into the ice lattice) marinate 12 hours or longer before they can tasty; -
(4) porridge of water to full boil before the next material: put a lot of water in a large soup pot, boil, only put the materials. First under the meat, ginger, do not fire off small pieces to the boiling water, the outside part of the heated and cooked hard, sealed inside the gravy, so the meat is not cooked porridge terrible, and then wait for the water again Nowadays boiling rice and a marinated chopped egg, and this first one under the preserved egg porridge and rice cook chopped, preserved eggs will melt into the taste of porridge; -
(5) the first fire, after a small fire, the furnace should be sufficient: the water boiling, and under the material, the first high heat for 20 minutes, then transfer heat and simmer for half an hour, enough heat, tasty soft porridge and easy to digest; -
(6) porridge texture processing: the heat and simmer for a half-hour later, the second preserved eggs are also chopped, and put the meat in the porridge cooked fish out, push lightly with chopsticks, torn trace-like, with the second back into the porridge with preserved egg, cook the last half hour, then turn off the heat. Preserved eggs off the heat in the second half an hour before adding the porridge, the second half hour will neither lime preserved eggs cooked flavor, while soft, smooth change, spur of the moment when they eat to have preserved eggs, and meat because it is water boiling nowadays, but also to maintain a certain flavor, shredded back after the porridge, especially delicious. -
this boiled porridge without salt, good taste, and under fire, easy to digest. If the porridge a little sticky at the end, please do not push lightly with a spoon pot of sticky skin, or else there will be paste porridge taste, we usually put a light in the bottom of the pot with a small spoon porridge cook, the water boiling process, a small spoon have been driven, to prevent sticking at the end of cooking porridge. -
-
41. pumpkin porridge -
ingredients: pumpkin 250g, rice 50g, sugar and a small amount -
practice: -
(1) first pumpkin steamed soft, mixed with steamed pumpkin juice with mashed pumpkin; -
(2) the necessary fuel will be adding an appropriate amount of water, the fire to boil 3 minutes, add pumpkin stir until boil again, open a small fire to cook for 15-20 minutes to slightly; -
(3) adding the right amount of sugar or let cool, add honey; -
I think pumpkin porridge has a very sweet flavor, and for the sake of the body, I do not have sugar. And the fridge after the ice had more to drink! -
Saturday, July 9, 2011
Monday, June 27, 2011
Friday, June 24, 2011
Air Jordan 2011 Shoes Cheap, Air Jordan 2011 Sale Online Basketball Shoes Store
$145.00 $97.99
Save: 32% off
Nike Dunk High 6.0 Black Midwest Gold$156.00 $99.99
Save: 36% off
Nike Dunk High Tennis Pack Hot Red Black$135.00 $94.99
Save: 30% off
Nike Dunk High Black Volt Splatter
Awesome Hyperfuse France National Team, communicates well, p ..
Save: 32% off
Nike Dunk High 6.0 Black Midwest Gold$156.00 $99.99
Save: 36% off
Nike Dunk High Tennis Pack Hot Red Black$135.00 $94.99
Save: 30% off
Nike Dunk High Black Volt Splatter
Awesome Hyperfuse France National Team, communicates well, p ..
Thursday, June 23, 2011
Athletic Shoes - leg, anatomy - World of Sports Science
Athletic Shoes The motto of the Olympic Games, "Higher, faster, stronger," is the essence of true athletic competition: the desire to achieve. The nature of competition has spurred the development of better and more efficient athletic equipment in all sporting disciplines, since the time of the ancient Olympics more than 2,700 years ago. The footwear used by modern athletes is a most prominent example of technological progress in sport.
Since the late 1800s, athletic footwear has moved from the custom product of an individual athlete who made modifications to seek a competitive advantage, to its modern status as a branch of sport science. High-quality athletic shoes are essential to athletic success, a product that represents an intersection between research and real-life applications. In some disciplines, the footwear is referred to as a "shoe"; in many parts of the world, there is the soccer and rugby "boot"; in the United States, football "cleats" is a common term; in track and field, athletes will refer to their specialized footwear as "spikes."
The evolution of specialized athletic shoes can be traced to unconnected events in England and the United States. The "plimsoll," (so named for its color), which resembled the plimsoll line on cargo sailing ships (the mark placed on the hull to show where the loaded ship would be riding in warmer or colder saltwater oceans), was the first mass-produced canvas, rubber-soled shoe. As tennis became more popular in the later part of the nineteenth century, the plimsoll became the first English all-purpose sport shoe.
The plimsoll concept was a motivation for the development of the American "sneaker," named for its quiet wear ability, and patented as the Keds brand in 1916. The sneaker in turn led to the development in the late 1930s of an iconic basketball shoe, the Converse "Chuck Taylors," made with a canvas upper supported by a thick rubber sole.
When the game of soccer was in its early stages of development in England in the 1880s, players usually wore durable work boots, weighing approximately 1.1 lb (500 g), without modification. Wet playing fields in England inspired the development of lighter, cleated boots, often constructed from supple kangaroo hides. In the 1930s in Germany, Adi Dassler, the founder of Adidas, began to experiment with a more functional soccer boot; Adidas later became the first soccer shoe manufacturer to employ a system of removal cleats. Modern soccer shoes, constructed primarily of synthetic materials, weigh less than 0.5 lb (250 g).
Athletic shoes, irrespective of the discipline for which they are designed, have four basic components: the upper, the insert, the midsole, and the outsole. Each component has a specific function in the overall efficiency of the performance of the athletic shoe. The upper serves to hold the shoe together, as well as to secure and protect the foot. It is designed to be as lightweight as possible and yet perform its function. The insert is the support mechanism for the foot, particularly the arch. The insert may also be designed to accommodate an orthotic, a specialty structure used to correct misalignment in the foot or legs. The midsole is the primary cushioning component that was formerly a rubber structure, and is now commonly rubber, air, or fluid gels. The outsole is designed to provide traction and prevent wear.
The chief purposes of any athletic shoe are the combined objectives of stability, flexibility, protection of the foot, and maximum traction on the running surface. To achieve these purposes, athletic shoe research in the past 50 years has emphasized the utilization of ever-lighter materials, and designs encouraging efficient movement. The thin, hard rubber of the original plimsoll sole evolved to one of molded rubber, and then injection molded PVC (plastic) by the 1970s. The modern athletic shoe sole, no matter what the sporting discipline, is now generally constructed of lightweight plastic and nylon materials.
A corollary development in the athletic shoe industry has been the popularity of many types of athletic shoes with the general population that use them for casual street wear. The attraction of these products is tied to the marketing of the shoes and the fashion appeal, as opposed to their performance characteristics.
The study of human movement, known as bio-mechanics, has featured prominently in athletic shoe research since the 1970s. Studies and development as to how to make the athlete most functional have been directed toward two general areas: the control of motion of the foot, known as pronation, that rolls the foot inward upon impact with the surface, which reduces running efficiency; and the effective cushioning of the foot without sacrificing weight or control.
Virtually every sport in which running or lower body stability are important has benefited from the development of a specialized type of footwear; shoes are now further specialized for use in different events within the same discipline. The track spikes worn by a 100-m sprinter will have a very strong sole, to withstand the explosive power applied when the sprinter leaves the sprint blocks; the shoes worn by 1,500-m runner may appear similar, but will often employ flatter soles and shorter spikes. American football cleats for use on natural grass surfaces employ a cleat at the toe for better pivoting; the shoes worn on artificial surfaces tend to employ a greater number of shorter cleats; a large football lineman, who will weight as much as 325 lb (147 k) or more, will wear a high-topped shoe that emphasizes stability and protection of the ankle. A smaller, faster receiver will often wear a lighter, low-cut shoe that permits greater flexibility, consistent with the position played.
Since the late 1800s, athletic footwear has moved from the custom product of an individual athlete who made modifications to seek a competitive advantage, to its modern status as a branch of sport science. High-quality athletic shoes are essential to athletic success, a product that represents an intersection between research and real-life applications. In some disciplines, the footwear is referred to as a "shoe"; in many parts of the world, there is the soccer and rugby "boot"; in the United States, football "cleats" is a common term; in track and field, athletes will refer to their specialized footwear as "spikes."
The evolution of specialized athletic shoes can be traced to unconnected events in England and the United States. The "plimsoll," (so named for its color), which resembled the plimsoll line on cargo sailing ships (the mark placed on the hull to show where the loaded ship would be riding in warmer or colder saltwater oceans), was the first mass-produced canvas, rubber-soled shoe. As tennis became more popular in the later part of the nineteenth century, the plimsoll became the first English all-purpose sport shoe.
The plimsoll concept was a motivation for the development of the American "sneaker," named for its quiet wear ability, and patented as the Keds brand in 1916. The sneaker in turn led to the development in the late 1930s of an iconic basketball shoe, the Converse "Chuck Taylors," made with a canvas upper supported by a thick rubber sole.
When the game of soccer was in its early stages of development in England in the 1880s, players usually wore durable work boots, weighing approximately 1.1 lb (500 g), without modification. Wet playing fields in England inspired the development of lighter, cleated boots, often constructed from supple kangaroo hides. In the 1930s in Germany, Adi Dassler, the founder of Adidas, began to experiment with a more functional soccer boot; Adidas later became the first soccer shoe manufacturer to employ a system of removal cleats. Modern soccer shoes, constructed primarily of synthetic materials, weigh less than 0.5 lb (250 g).
Athletic shoes, irrespective of the discipline for which they are designed, have four basic components: the upper, the insert, the midsole, and the outsole. Each component has a specific function in the overall efficiency of the performance of the athletic shoe. The upper serves to hold the shoe together, as well as to secure and protect the foot. It is designed to be as lightweight as possible and yet perform its function. The insert is the support mechanism for the foot, particularly the arch. The insert may also be designed to accommodate an orthotic, a specialty structure used to correct misalignment in the foot or legs. The midsole is the primary cushioning component that was formerly a rubber structure, and is now commonly rubber, air, or fluid gels. The outsole is designed to provide traction and prevent wear.
The chief purposes of any athletic shoe are the combined objectives of stability, flexibility, protection of the foot, and maximum traction on the running surface. To achieve these purposes, athletic shoe research in the past 50 years has emphasized the utilization of ever-lighter materials, and designs encouraging efficient movement. The thin, hard rubber of the original plimsoll sole evolved to one of molded rubber, and then injection molded PVC (plastic) by the 1970s. The modern athletic shoe sole, no matter what the sporting discipline, is now generally constructed of lightweight plastic and nylon materials.
A corollary development in the athletic shoe industry has been the popularity of many types of athletic shoes with the general population that use them for casual street wear. The attraction of these products is tied to the marketing of the shoes and the fashion appeal, as opposed to their performance characteristics.
The study of human movement, known as bio-mechanics, has featured prominently in athletic shoe research since the 1970s. Studies and development as to how to make the athlete most functional have been directed toward two general areas: the control of motion of the foot, known as pronation, that rolls the foot inward upon impact with the surface, which reduces running efficiency; and the effective cushioning of the foot without sacrificing weight or control.
Virtually every sport in which running or lower body stability are important has benefited from the development of a specialized type of footwear; shoes are now further specialized for use in different events within the same discipline. The track spikes worn by a 100-m sprinter will have a very strong sole, to withstand the explosive power applied when the sprinter leaves the sprint blocks; the shoes worn by 1,500-m runner may appear similar, but will often employ flatter soles and shorter spikes. American football cleats for use on natural grass surfaces employ a cleat at the toe for better pivoting; the shoes worn on artificial surfaces tend to employ a greater number of shorter cleats; a large football lineman, who will weight as much as 325 lb (147 k) or more, will wear a high-topped shoe that emphasizes stability and protection of the ankle. A smaller, faster receiver will often wear a lighter, low-cut shoe that permits greater flexibility, consistent with the position played.
Monday, May 30, 2011
Language papers in a
1.__________ for the Iraqi people were emaciated
students Consumers A: incense burner do not regret the end
(being interpreted as br> 2. asked him what so clear ,__________
students A: The springs in the hearts of its own
(being interpreted as br>
3. What if a total of Lin Ku ,__________
student A: The husband and wife to sit dawn
(language teacher laughed when scoring halo. After he said this in class, and halo! Positive Solutions as action, hehe, it fit the facts A)
5. A gentleman oblige ,__________
students: Villain takes away people's love
(direct Yunsi)
6. poor A student is immune ,__________
: the rich queens
(positive solution: up and the world economy)
7.__________, the world students who Bushi Jun
A: As long as looks like Saddam
(Khan |||....)
8. concubines A thousand people ,__________
students: an iron bar also ground into a needle ~~~~~ ~
(being interpreted as A: Both husband and wife around the house also
(being interpreted as classmates Answer: on the wrong palanquin married on Lang
11.__________, Zaokangzhiqi Church
students no less than A: The statement issued by her husband not to go to bed
(language teacher fury!)
< br> 12. Nung ,__________
students A: The diamond is forever
(was laughing, now I feel very classic. are interpreted as Cypriot students Piedmont egrets fly ,__________
A: East Village river turtles crawl
(on the very neat)
14. I would advise students to God re Dousou ,__________
A: God told me roar roar three
(being interpreted as another student A: mouse son can make hole
(whole language teacher office without the image of the collective laughter)
16. Tianruoyouqing days old classmates ,__________
A: The people do not Merry Wasted!
(being interpreted as Please do not tell him
(being interpreted as his aging mother remains charming, especially memory
19. good medicine tastes bitter ,__________
students A: do not eat is a fool
Everyone must die ,__________
students A: There is only death has
(outcome: parents teachers to stay after the lecture birds ... ...)
20. Moonlight ,__________
students A: Li Bai Hong
21 sleeping . Guanzhongkuibao ,__________
student A: I'm surprised
(ha ha ha! is interpreted as Pa TV
23. grape wine Remanbar ,__________
students Answer: a lot of money and beauty
24.__________, pedestrians Deep Sorrow
masterpiece of junior middle school students : middle of the night ghost knocking
25. There are times exam Tao 26. 老吾老以及人之老 ,__________
students A: The wife of my wife and the wife who
(teacher, said later that the students marking a particularly dedicated, ha ha)
27. Looking back, armored cavalry ,__________
students A: see today, stalker
(being interpreted as Lan mountains between arms ,____________________
students A: It is when they married
31. sunk boat sail past thousands of junks students ,__________
A: peacock pattern more
32. books to hates few when goes ,__________
students with A: the end is not enough money to spend
33. Tianruoyouqing days old classmates ,__________
A: If people love die young
( is interpreted as br>
35. there are times that test Qingzhao's Dream, is Lvfeihongshou > 37. Language examination, fill in the blank there is a revolution in poetry:
students A: In order to have locked the dog climbing out of the hole / hell are locked!
38. mountains and seas always love ,___________
students A: give a were okay
(Volume teacher approved the sentence: Love is the situation, points are points, do not give a line)
39. high school, when a monthly exam, the sentence laugh to go out, (Positive Solutions) How can it be basil people my generation. Class has been written: accidentally twisted waist. Another one, last sentence: Some people write, silt out of lotus root; there are more must, write: The start of both
40. I ask, can a misery ,___________
students A: is like a pot of Erguotou
(teacher approval
students Consumers A: incense burner do not regret the end
(being interpreted as br> 2. asked him what so clear ,__________
students A: The springs in the hearts of its own
(being interpreted as br>
3. What if a total of Lin Ku ,__________
student A: The husband and wife to sit dawn
(language teacher laughed when scoring halo. After he said this in class, and halo! Positive Solutions as action, hehe, it fit the facts A)
5. A gentleman oblige ,__________
students: Villain takes away people's love
(direct Yunsi)
6. poor A student is immune ,__________
: the rich queens
(positive solution: up and the world economy)
7.__________, the world students who Bushi Jun
A: As long as looks like Saddam
(Khan |||....)
8. concubines A thousand people ,__________
students: an iron bar also ground into a needle ~~~~~ ~
(being interpreted as A: Both husband and wife around the house also
(being interpreted as classmates Answer: on the wrong palanquin married on Lang
11.__________, Zaokangzhiqi Church
students no less than A: The statement issued by her husband not to go to bed
(language teacher fury!)
< br> 12. Nung ,__________
students A: The diamond is forever
(was laughing, now I feel very classic. are interpreted as Cypriot students Piedmont egrets fly ,__________
A: East Village river turtles crawl
(on the very neat)
14. I would advise students to God re Dousou ,__________
A: God told me roar roar three
(being interpreted as another student A: mouse son can make hole
(whole language teacher office without the image of the collective laughter)
16. Tianruoyouqing days old classmates ,__________
A: The people do not Merry Wasted!
(being interpreted as Please do not tell him
(being interpreted as his aging mother remains charming, especially memory
19. good medicine tastes bitter ,__________
students A: do not eat is a fool
Everyone must die ,__________
students A: There is only death has
(outcome: parents teachers to stay after the lecture birds ... ...)
20. Moonlight ,__________
students A: Li Bai Hong
21 sleeping . Guanzhongkuibao ,__________
student A: I'm surprised
(ha ha ha! is interpreted as Pa TV
23. grape wine Remanbar ,__________
students Answer: a lot of money and beauty
24.__________, pedestrians Deep Sorrow
masterpiece of junior middle school students : middle of the night ghost knocking
25. There are times exam Tao 26. 老吾老以及人之老 ,__________
students A: The wife of my wife and the wife who
(teacher, said later that the students marking a particularly dedicated, ha ha)
27. Looking back, armored cavalry ,__________
students A: see today, stalker
(being interpreted as Lan mountains between arms ,____________________
students A: It is when they married
31. sunk boat sail past thousands of junks students ,__________
A: peacock pattern more
32. books to hates few when goes ,__________
students with A: the end is not enough money to spend
33. Tianruoyouqing days old classmates ,__________
A: If people love die young
( is interpreted as br>
35. there are times that test Qingzhao's Dream, is Lvfeihongshou > 37. Language examination, fill in the blank there is a revolution in poetry:
students A: In order to have locked the dog climbing out of the hole / hell are locked!
38. mountains and seas always love ,___________
students A: give a were okay
(Volume teacher approved the sentence: Love is the situation, points are points, do not give a line)
39. high school, when a monthly exam, the sentence laugh to go out, (Positive Solutions) How can it be basil people my generation. Class has been written: accidentally twisted waist. Another one, last sentence: Some people write, silt out of lotus root; there are more must, write: The start of both
40. I ask, can a misery ,___________
students A: is like a pot of Erguotou
(teacher approval
Wednesday, May 25, 2011
Do not really a woman online
Do not really a woman
Internet
;
Do not really a woman
online
text / network / edit / purple shell
network
a platform for falsehoods, how many stories the truth played here? How much fraud happen here? Some of the reality of love lost confidence, but find true love in the network; also been fully involved a network of love, only to confused covered with scars. Two lonely hearts, two after the collision between the cold of the keyboard, and how much forever? How much regret leaving?
love in sweet, from the time desolately Cancan. fall in love, platonic love. A pure spiritual love, and their exchanges, can only rely on the text. Online dating, for love is largely text. Articles on online dating, online dating stories, sad stories online dating more.
courtship had normal, the chances of success are minimal. Like moths to flame like love, but some people still fought. Online dating is largely a feeling robbed, and robbed people not avoid is the situation, ironically, is not subject to rational control of emotion, behavior, able to accept intellectual control, and finally how many people are still facing the networks abandoned the love say bye.
online women are not confused, and sometimes a bit silly, why I do not know. May Love is involuntary
chat online chat more, the course of time the situation will be students. Men always think that far, have had with their distance. So popular online thoughts, sad pop, pop unforgettable online dating.
Some men, perhaps we should cherish. Value is not zero distance, but much to miss, but appreciate the far, far blessing.
But some men, the cover name of love, cheating love Pianse. When an inadvertent click, free chat in a few words about creating a sense of goodwill, the gentle, dignified, sensible women to become their preferred chat. Female friends, do not let men greeting careful, timely and considerate to your head. Drizzles silent, they know how to move a woman's heart, this man is also the most lethal.
met friends when you thought, sinking, romantic and caring heart eager to heat up, whether to pay regardless of all the feelings, then you are wrong. They use the Internet is not to sentence his wife back, leaving a stable home, the feeling is that you can not give him. He Internet is to find mental stimulation. Pretend to be pious. As before, the network is no longer a liar, pretending to a miserable, unhappy family life, say, the wife is the east lion roar. Now the cyber-crooks will say how happy the family is, how beautiful and wonderful wife, the children are so cute, how he loves his wife loves home, he said he was against online dating, friends that users should stay on the web. Make you feel how humane he is a good man. Commensurate with his brother and sister will be with you. Tell you sister, parent sister. He cared about your daily diet, care about your thoughts emotions. Zhilengzhire and considerate. You can not help but fall in love with him, crush him. Painful for him, for he could not sleep the night for his tears. Every day looking forward to his head to light up. But you know how much his sister network, pro-sister, and even the little darling baby? He does not love you. Fall in love with him, crush him you deserve. He tired, tired, not fresh, and with a sense of satisfaction, a sense of accomplishment and look very new stimulus, so that you feel powerless and frustrated empty sadness.
Some men online is to find a lonely can soothe his heart sinking woman. Dependence is a spiritual and sustenance Bale. If a woman put too much emotion, so that he felt tired and afraid, he would disappear without a trace in the net of the sea. Because they use the Internet is to relax, let alone the heart gets warm. Rather than the more emotionally tired, helpless. If you want to contact the man and so good a little longer. Keep a distance, do not put too much. If you do not listen, one day he will disappear in the vast network the sea, just you wait in front of the computer journeying.
network, it is really fascinating, fans get a little confusing people. Truth, here it is for how long? Us no one has carefully thought about online women, most of the talented Smirnov, most excellent environment to live in abundance, there is a desire for beauty, pet care being hungry heart, talk to, do Do My Love! Sometimes we will fall into the trap a little lax. ... ... Some men, perhaps we should cherish. Value is not zero distance, but much to miss, but appreciate the far, far blessing. That is the so-called male confidant. Male confidant is willing to share your anguish, but no gender awareness boyfriend, is to appreciate and respect your thoughts man. If you really had this type of male confidant, this is not only a happy woman, also a kind of lucky. This man is a man in Need. Can this man is a woman confidante of the woman's boutique.
Throughout themselves, can only be a mediocre woman, not to pursue any male confidant. Not cocoon. Cherish, cherish the happiness has the most sensible choice. Cherish our own it, cherish our feelings, because feelings are precious, limited. We have to understand, reveal that layer of mystery, we are living in reality, are worldly woman!
see my students for the lovesick, unable to extricate themselves into online dating, and they also love their husbands, to love their children, but always She Buxia this situation. Sad tears the night can not sleep, thinner than yellow, knowing no results, but so why bother?
online woman, never give love, do not be fool woman!!
Network is beautiful, but do not themselves trapped in the web central!
Welcome to purple shell learning points
Internet
;
Do not really a woman
online
text / network / edit / purple shell
network
a platform for falsehoods, how many stories the truth played here? How much fraud happen here? Some of the reality of love lost confidence, but find true love in the network; also been fully involved a network of love, only to confused covered with scars. Two lonely hearts, two after the collision between the cold of the keyboard, and how much forever? How much regret leaving?
love in sweet, from the time desolately Cancan. fall in love, platonic love. A pure spiritual love, and their exchanges, can only rely on the text. Online dating, for love is largely text. Articles on online dating, online dating stories, sad stories online dating more.
courtship had normal, the chances of success are minimal. Like moths to flame like love, but some people still fought. Online dating is largely a feeling robbed, and robbed people not avoid is the situation, ironically, is not subject to rational control of emotion, behavior, able to accept intellectual control, and finally how many people are still facing the networks abandoned the love say bye.
online women are not confused, and sometimes a bit silly, why I do not know. May Love is involuntary
chat online chat more, the course of time the situation will be students. Men always think that far, have had with their distance. So popular online thoughts, sad pop, pop unforgettable online dating.
Some men, perhaps we should cherish. Value is not zero distance, but much to miss, but appreciate the far, far blessing.
But some men, the cover name of love, cheating love Pianse. When an inadvertent click, free chat in a few words about creating a sense of goodwill, the gentle, dignified, sensible women to become their preferred chat. Female friends, do not let men greeting careful, timely and considerate to your head. Drizzles silent, they know how to move a woman's heart, this man is also the most lethal.
met friends when you thought, sinking, romantic and caring heart eager to heat up, whether to pay regardless of all the feelings, then you are wrong. They use the Internet is not to sentence his wife back, leaving a stable home, the feeling is that you can not give him. He Internet is to find mental stimulation. Pretend to be pious. As before, the network is no longer a liar, pretending to a miserable, unhappy family life, say, the wife is the east lion roar. Now the cyber-crooks will say how happy the family is, how beautiful and wonderful wife, the children are so cute, how he loves his wife loves home, he said he was against online dating, friends that users should stay on the web. Make you feel how humane he is a good man. Commensurate with his brother and sister will be with you. Tell you sister, parent sister. He cared about your daily diet, care about your thoughts emotions. Zhilengzhire and considerate. You can not help but fall in love with him, crush him. Painful for him, for he could not sleep the night for his tears. Every day looking forward to his head to light up. But you know how much his sister network, pro-sister, and even the little darling baby? He does not love you. Fall in love with him, crush him you deserve. He tired, tired, not fresh, and with a sense of satisfaction, a sense of accomplishment and look very new stimulus, so that you feel powerless and frustrated empty sadness.
Some men online is to find a lonely can soothe his heart sinking woman. Dependence is a spiritual and sustenance Bale. If a woman put too much emotion, so that he felt tired and afraid, he would disappear without a trace in the net of the sea. Because they use the Internet is to relax, let alone the heart gets warm. Rather than the more emotionally tired, helpless. If you want to contact the man and so good a little longer. Keep a distance, do not put too much. If you do not listen, one day he will disappear in the vast network the sea, just you wait in front of the computer journeying.
network, it is really fascinating, fans get a little confusing people. Truth, here it is for how long? Us no one has carefully thought about online women, most of the talented Smirnov, most excellent environment to live in abundance, there is a desire for beauty, pet care being hungry heart, talk to, do Do My Love! Sometimes we will fall into the trap a little lax. ... ... Some men, perhaps we should cherish. Value is not zero distance, but much to miss, but appreciate the far, far blessing. That is the so-called male confidant. Male confidant is willing to share your anguish, but no gender awareness boyfriend, is to appreciate and respect your thoughts man. If you really had this type of male confidant, this is not only a happy woman, also a kind of lucky. This man is a man in Need. Can this man is a woman confidante of the woman's boutique.
Throughout themselves, can only be a mediocre woman, not to pursue any male confidant. Not cocoon. Cherish, cherish the happiness has the most sensible choice. Cherish our own it, cherish our feelings, because feelings are precious, limited. We have to understand, reveal that layer of mystery, we are living in reality, are worldly woman!
see my students for the lovesick, unable to extricate themselves into online dating, and they also love their husbands, to love their children, but always She Buxia this situation. Sad tears the night can not sleep, thinner than yellow, knowing no results, but so why bother?
online woman, never give love, do not be fool woman!!
Network is beautiful, but do not themselves trapped in the web central!
Welcome to purple shell learning points
Monday, May 16, 2011
Yang Shen cream 】 【 unisex
Please eat a bowl every day: how effective
try to adhere to a bowl every day, and now drink more than three consecutive weeks, before a better place where there's no recurrence of white hair, and now one does not, ah, I was really happy. Not only the white hair was gone, and the skin is a lot of white and smooth, better than the original color it! Good things to share, so I told this recipe better friends, but most people just hear the black skin and white hair can be changed for the better when you are interested, but then one is quickly shaking his head, that day are tired from work, and how could it have the energy to porridge, huh, huh. In fact, boil the porridge is very simple, ah, to respect their bodies more time and effort even if there is anything wrong with it, so I wrote this recipe right here, friends want to give the benefit of affinity. You happy, I will happy, huh, huh.
< br> black beans (1 small handful)
black rice (2)
;
black sesame seeds (a small handful)
Lily (10)
;
Barley (3)
;
Walnut (2)
; rice (2)
;
brown sugar, walnuts can be replaced by other peanuts.
the amount of more than two people.
put them in every day at noon I put the bowl a good soak in the evening washing dishes when he started to porridge, about 10 minutes water into thick when you can, turn off the heat, cover and nausea. The next morning add a little water, put brown sugar and heat for two minutes to ok it!
In addition, I have observed, the drink more than three weeks after the porridge, my nails from the two small crescent ( thumb) become seven, and so happy! Porridge after another child, this winter began to change his face ruddy the (previously is white), the body changes a lot of fruit.
try to adhere to a bowl every day, and now drink more than three consecutive weeks, before a better place where there's no recurrence of white hair, and now one does not, ah, I was really happy. Not only the white hair was gone, and the skin is a lot of white and smooth, better than the original color it! Good things to share, so I told this recipe better friends, but most people just hear the black skin and white hair can be changed for the better when you are interested, but then one is quickly shaking his head, that day are tired from work, and how could it have the energy to porridge, huh, huh. In fact, boil the porridge is very simple, ah, to respect their bodies more time and effort even if there is anything wrong with it, so I wrote this recipe right here, friends want to give the benefit of affinity. You happy, I will happy, huh, huh.
< br> black beans (1 small handful)
black rice (2)
;
black sesame seeds (a small handful)
Lily (10)
;
Barley (3)
;
Walnut (2)
; rice (2)
;
brown sugar, walnuts can be replaced by other peanuts.
the amount of more than two people.
put them in every day at noon I put the bowl a good soak in the evening washing dishes when he started to porridge, about 10 minutes water into thick when you can, turn off the heat, cover and nausea. The next morning add a little water, put brown sugar and heat for two minutes to ok it!
In addition, I have observed, the drink more than three weeks after the porridge, my nails from the two small crescent ( thumb) become seven, and so happy! Porridge after another child, this winter began to change his face ruddy the (previously is white), the body changes a lot of fruit.
Wednesday, May 11, 2011
200 decoration tips ( married , not married have a look , very useful)
1, the partition will not be the first shoe, leaving a little space so that the shoes can leak into the bottom ash, sink and gas stove top mounted lights. Given the location of the bathroom floor drain must first think well, a good amount of size. To drain the best side in the brick, if the bricks in the middle of it, no matter how kind of tilted blocks, floor drain will not be the lowest point.
2, bathroom, air conditioning, no outlet design switches. Especially the bathroom water heater, a pair of level switch with a plug appropriate. To off to electric, pull the plug dangerous
3, on the brick part of the treatment of sun angle, the final analysis is to look at the workers level. If the level of good workers, plasterers, and better tools for grinding ceramic tile, they should not hesitate to choose the practice of grinding a 45 degree angle. In effect, as long as a good grinding, grinding angle of 45 degrees in the positive approach is the most beautiful! If the level of the workers do much, then you still choose to be positive angle, because the bad grinding angle of 45 degrees angle of approach is not as yang effect of article.
4, line up the pipes after the water pressure test is also very important. Test, we must be present, and the test for at least 30 minutes or more, conditions permit, preferably an hour. 10 kg of pressure, without any reduction before the final test.
5, when the steel doors steel door must be considered a good size wall frame protruding inform the installer, making the final frame and affixed to the wall tiles are flat finish, so not only beautiful, and good health to do.
6, carpenters and masons of the package Door tiling is to tie in, including door pocket of the time, to consider the following ground (the ground side of the door either side) is also affixed to ceramic tiles or other cement mortar matter because the door pocket before the nail if the tiles stick better, has packages to the ground, with cement when the future, if the cement and Door stained, moldy water will cause wood Door
7, under the mattress and the bed board must be breathable. Bed board is best for general use cedar board
8, do the paint as much as paper tape
9, buy a lamp to note: General tried to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other coatings plated iron above, ah, ah nothing like paint, easy to fade.
10, washbasin as ceramic pots, glass pots downright Health
11, water and electricity to its own transformation plan, and ask them to open Cao straight line. Watching them draw their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.
12, water must be good, be sure to test the water!
13, many of the construction of a verbal agreement into the gap checkout slaughtered, must be written in black and white, a change in the project are sure to ask what the price, write it!
14, ground floor, if installed, to re-do all the ground re-smooth layer of cement.
15, the kitchen door, or to make a wooden decoration hanging rail wood doors for good.
16, the living room as much as possible to install the power plug.
17, is still to be done outside the bathroom shower partition. A shower curtain can not pull the easy way wrong, real inconvenient, water everywhere.
18, do door and frame materials to choose fine grained materials.
19, before installing the cabinets must be sure your home water is OK.
20, kitchen floor tiles will not pick white.
21, ceiling, pay special attention to smooth putty before wiping Dulux
22, the number of living room lighting should not be too light, simple is better, or like the lighting shop!
23, to buy things that need to be installed as the installation requirements of sellers, it does not include installation, it must adhere to only pay the full paragraph after the installation! !
24, the renovation period, before you collect from business card manufacturers carry
25, Lvkou Ban the protective film is best removed before installation.
26, shoe is best to use shutter doors, deodorant. Edges can leave a shoe outlet, to plug drying shoes.
27, cutting and a small safe place to light.
28, it is convenient restaurant exhaust fan can also be safe, so when you eat hot pot or do not dirty barbecue houses the Office of the ceiling.
29, the door is best to arrange a place debris in the cabinet, can be placed on top of shoe. The common things, such as umbrellas, bags, scissors, change, eat the medicine, and so on there, so it is convenient.
30, there is no need to use your ceiling, if not too worried about moisture and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, my health to do a guest, very beautiful. If you must use Lvkou Ban smallpox, it is recommended:
1, not too expensive.
2, using the net color, especially in the kitchen ceiling, white on the good, the color white unless and decoration style match, it will easily inconsistent.
3, download their own ideas, do not believe selling the vision of smallpox, their vision was widely soil.
4, staring at himself in the scene, closing side is very important, do not let them slack, or leave a black seam, how to look how ugly.
31, the third day and continued to stick largely perforated tiles, range hood, and water heaters to pre vent lay, and if so then perforated tiles stick better, not easier. Therefore, before the renovation must be selected in the range hoods, stoves and water heaters, to determine the size of punch.
32, although taking into account the custom-made cabinets look good, but not durable, comprehensive views of some of my classmates online and experience, to counter the framework of using cement to do, inside and outside the sides stick tiles, marble countertop shop, wall cabinet and cabinet wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And spent another few. Read a good many of his neighbors say, I did not blow.
33, well after the door pocket, plasterers plaster line to start the installation, wall Pihui works. Comparison of the wall of my house was originally formed, approved 2-3 road on it. Pihui granted when a gray polished once, and then brush the primer, sanding again, after brushing, and finally twice with ICI paint brush, the entire wall looks smooth and flat, really good. Upon completion of the ceiling wall, a carpenter started wardrobe. Albert wardrobe is 18cm's license Daixinban do paste veneer outside, although there is no furniture store to buy so good-looking, but durable, quality should be better than to buy. I'm not afraid of standing container board. I am afraid that is not enough to buy. Backplane is relatively thick, buying is thin.
34, other students in the tiling must pay attention to the following points:
① best he can in the scene.
② some less than perfect tile can attached in the future some workers do not see the location, such as cabinets, sinks, mirrors behind, but also pay attention to tile, brick, etc. Do not waist is more than the workers attached to the position, otherwise You can not see anything in the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the flood damage must be enough time.
④ sure to floor drain plug with something good out of cement down to prevent clogging. My family just because off the cement floor drain is blocked, and spent 30 looking for the management office to clear, get up a lot of small mud.
⑤ people at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of bricks, it is the heartache, all the blood and sweat Mimi Yeah.
35, a wall of long, high. Such as a bathroom with four walls, each wall should measure out of its long, high. And then deducting the area one of the windows and doors. Finally, a numerical ground area. After the size of the amount you can also get a sub shop selling tiles, they will help you re-match. Loss of 5 percent-plus on the line.
36, the best is a two bedroom dome light control, and a door, a bed, lying on the bed save the winter and then it turn off the light.
37, the socket must be considered a good location, height, interval. Even first met playing steel cassette position, the latter is found to just be put away the magazine TV cabinet, microwave ovens, desks block, had to move the location of the first two high furniture, and eventually found not only ergonomic height, but also can not buy a good fit stainless steel cabinet legs, can only be made of aluminum foot.
38, just around the corner in the hallway of the tube with a good, bright and have that effect.
39, did not take into account when loading the table lamp placement, it lights not in the middle of the table.
40, bathroom tiles do not use too much pigment, one easily dirty, and second, a long time, too dull!
41, outlet to more equipment, furniture to buy outside the ground to dirt security to consider, like to see more housing, in principle, should adhere to.
42, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see significantly different results. Buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.
43, the color of brick is hard to find satisfactory, and I did not find, however, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is indeed the bricklayer himself put forward good suggestions.
44, on the balcony on the top cupboard, then hit the back of the cabinet with a layer of waterproof insulation foam board works well. Balcony door is best to use the same type of fire board. Balcony environment is harsher.
45, if no suitable molding may wish to custom, custom quality seems better than the sample also. More personalized and customized.
46, bathroom cabinets with stainless steel legs are huge profits to find some local stores to buy back price of mad cheap.
47, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.
48, Paco the floor well, I like only to remind the boss about the price may be directly to a salesperson about the price ratio and better.
49, matte painting is beautiful than the high light
50, if the re-decoration will use putty instead of talc products.
51, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside use, electrical proposals put new ones in the room, and now that he suggested this valuable.
52, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.
53, the audience delicate pots pots than on stage, good-looking, good cleaning. Basin mixer with the audience to pay attention, taking into account the basin edge thickness, leading to longer mouth.
54, without any modification of the wall angle is also very beautiful, but to advance the stage of looking for the painter and the painter clearly put forward. angle Ding Jiaoxian do help to play the straight line.
55, online slots before the cement surface, surface treatment approved putty is very important, for no solid surface with a clean ball handling is very appropriate.
56, make plaster suitable for a large hole on the wall, of course, if the hole is too big or need to use cement.
57, frosted glass on the back do not coated with paint to protect the hard to clean!
58, Caipen leader can be sure to switch back of the hand, that must be not easy to keep clean fingers, hand turn up when the oil is also difficult.
59, the price of luxury auto racks too much water, and found a number of relatively unknown brand in the structural design on the front line rather than the brand, the price is much lower.
60, could be considered safe on the ground of the metal socket, this socket 100 is very expensive, but very convenient, usually flush with the ground, the foot can plug a foot to pop up. Suitable for large living room. Or on a dining room table, below, is used to insert hot pot (to prevent hanging back and forth when moving wires)
61, storage room. TX has been said, but I did not do doors, looks very beautiful and easy to put dirty clothes in the cupboard.
62, starting bed frame (which is so called up.) I am a professional company to buy the cloth-bed bed, and spent 350 yuan plus a such a thing, end of the bed there is a pull handle, the bed board will be turned up, exposing the bottom of the storage space, what a great Oh!
63, is not practical double bar towel rack! Current and single-pole uses the same basic level does not look inside and then drying towels hanging pole
64, inside the cupboard that the trash is not enough practical, than on the outside. There do not install the door panel of the trash bin and table, open the door when the summer will be very smelly. Trash or on the outside good.
65, the table next to the small cabinet, and can be placed on some stuff, very convenient.
66, to I think the mop bucket less demanding in terms of performance, one can assemble themselves out of covered and the surrounding environment that is consistent with tile or mosaic appearance, and money.
67, the bathroom can point nail nail to hang something in the hook.
68, designed a bathroom cupboard put clothes, no longer have to worry about bathing forgot to clean clothes.
69, washing machines with drying is not serious and practical, in addition to one year, only the yellow mold-day, and the evil giant. Thick clothes, towels or drying quit, let the sun consumer disinfection to be good. Even overdrawn, you need to save the point of silver.
70, even in the laundry room to do a laundry tub, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundry tub, became my most frequently used a washing area. What rag ah, ah socks, and towels, ah, all washed in it, and even most hands there too.
71, fitted with lights really not practical, the decoration done up to now not opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under romantic, and now do not have much chance of opening spot.
72, the biggest lesson learned is that in fact the simpler the better fitting, less pollution, less money, peace of mind.
73, useful stuff:
① designed storage room.
② wash the dirt used in the north balcony of the sink. Differences between the washbasin and toilet and washing vegetables for the kitchen sink.
③ bathroom can be pulled out of the leading shampoo. (TX shampoo basin was never an exception.)
④ easy to clean the floors and the appropriate cleaning tools.
⑤ work lights the kitchen table.
74, buy a toilet must be a good amount of their own pitch, or go buy a return that is really ... ...
75, Bath and Kitchen floor tiles stick better after a good amount of what the former did not do the level of the lowest point is not looking at the floor drain, or other teams did and decoration after passing, a lot of dead cells.
76, window beads Angeles with the Great Wall of stone tiles is a 800X800. Manufacturers cut and edging, Mason posted. Pattern did not look good also
radiation.
77, bathroom shower room must be large enough size, and use transparent glass, shower in it will not seem so cramped.
78, should not use white cement tiles pointing hook. Did not become a black month gap, ugly death. The results they have bought their own hook pointing agent, that tired
79, the cabinet should be pad under the artificial stone after the board, with the result that there is no installation, it can not cut the meat in the above, promised to give me almost two months have not installed installed (only to polished once).
80, do not confuse the letter designer. Of course, you can visit several decoration companies and more, from the design in each extract something truly useful, the key is what you want to dress up like home improvement.
81, if the floor drain has been installed by the original developers that hinder foul of the
82, bathroom tiles affixed to the ground after a good test the water, if water is relatively slow to rework immediately. Our household's water is relatively slow, then relented a bit, it was always a little bath water, and made hundreds of our main Guardian have idle money in the shower head, and wonder how the total now relief.
83, fitted wash basin and mirror to be considered good, put brush cup shelf, towel rack relative position.
84, bought the mirror to consider the position of mirror front lamps, and if do not want to install a temporary mirror front lamps, mirrors the size of the cover for the mirror to be able to set aside the line of the best light.
85, put washing on the balcony to be a small cabinet, easy to put some debris, such as washing powder within the debris. Both beautiful and practical
86, must be staring at the upstairs upstairs to do down the dripping water .... otherwise, get the wall cabinet, the wall is a mess ....
87, do not blindly follow the online buy, I later found that some themselves to buy cheaper than the bargain.
88, TV backdrop will set up a few more outlets, TV, DVD .... a put, you will find enough outlets.
89, change the water well in the future to be considered before loading in the wash basin in the bulk sample, for example, the left or right pots pots, water and drainage that is located in what place. Otherwise, changing for the better after the discovery phase of the wash basin was not fit!
90, on the curtains, we had better put your stay a size goes, the boss can not be less that size. If less, then, how how the. Or watched him cut his cloth.
91, the decoration of the construction process:
(1) approach, breaking down a wall.
(2) bathroom, kitchen floor to do 24 hours of closed water tests (required the developer to complete this task.)
(3) cutting trough, water, electricity transformation and acceptance.
(4) sealed underground water hidden trough renovation project without closing the water leakage test started waterproofing.
(5) bathroom, kitchens wall disk.
(6) Carpentry approach, suspended ceilings, plaster moldings.
(7) packages Door, window cover. Making wooden cabinet frame.
(8) simultaneous production of wooden doors, plastic doors and even pressure.
(9) wooden panel paint brush dust (edible vegetable oil).
(10) leveling the table laying marble windowsill.
(11) wood trim panel, pasted, fine line production and installation.
(12) wall primary treatment, grinding, leveling.
(13) belongings, the door seams paste stickers (protected side).
(14) ICI oil for at least three times the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, skirting.
(17) lighting, sanitary ware, handle, door lock installation.
(18) clean up, floor tiles make up joints, dismantling.
(19) decoration preliminary acceptance within the company.
(20) three formal acceptance of appointment, delivery owners.
92, flue gas valve back together, be sure to clean and ensure the valve can switch freely and to able to open to the maximum, otherwise it will affect the effect of smoke hood. To remain in the installation of two ceiling is not installed, so hood and try and correct installation of the ceiling and then installed.
93, so much in the living room and dining room ceiling can not do not do it.
94, good air conditioning in order to take the line position, the power closer to the air conditioning as much as possible, so install air conditioning power cord to see part of it, leaving a trace of regret.
95, to personally measure and record all the available house sizes, size map will be covered 楼书 units and then re-wire tagging, the final size will directly affect the interior design and furniture purchases.
96, line a bad choice if small size of the black walnut is always enough air, then need to have choice, or to accommodate actual or attached their own ideas, of course, be both the best
97, began looking for decorators. To personal experience is concerned, if not particularly large size and intended to simple decoration, it seems more cost-effective to find some of the guerrillas. After installation it is best to introduce people, you have read and agree to the eyes, especially the feeling of the person in charge of the decoration is more important, responsibility and appreciation of how, some of the former is more critical, because if only a stripped-down, in fact, those who live almost on the outside will do mix, but the quality is good or bad may depend on a sense of responsibility.
98, the main furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. had better take a look in advance, if the running around on the tired, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so the next thing you do is based on their desired style filter out the right things slowly. Some people take good style, while others grasp of color standards, it does not matter, anyway, there is time to consider, if you wait until clearance decoration, furniture, help wanted steps to go in the final will reluctantly accept the inevitable and not very much.
99, has been optimistic about the furniture of the best down to size and then to display the future situation of the virtual room.
100, the necessary documents to buy something good must be preserved, a move that may exist on the post-retirement, a replacement will definitely benefit. In particular, some important items of the store receipts, brochures, etc., because a lot of things have a warranty period, the evidence lost would be more trouble.
101, during the construction projects are sure to increase or decrease the price they asked for and then write it in black and white.
102, check whether the construction is necessary protective measures, such as entrance doors to use pearl cotton wrap, a good window and floor tiling also appropriate protection.
103, as much as possible to communicate with construction workers, to determine whether he understands your intentions. Put ourselves in every respect the work of the master, respect him, and people feel the importance of family, and began to live to whether it is more responsible for some of it? Saying goes, is not called (But if you face a treacherous cunning bully, who, it would have to retaliate, argue) in particular to some marginal projects is the need for several types of co-ordination, co-workers will be responsible to coordinate their respective duties, Otherwise, we pass the buck back and forth, all pass the buck. Like my mason to help me solve some carpentry thing, and electrical and resolved some masonry problems. Because each teacher's experience is different, as long as he is willing to help you find a way.
104, do not do the best furniture fixed, because it no longer may be some changes in the layout. If we do have to grasp the quality, or endless trouble.
105, be sure to change the water carefully, one charge of money; Secondly, if you do not need from the floor to the ceiling laid down water pipes, water pipes in case of a problem to big trouble.
106, according to their actual needs and reasonable arrangements for wiring, so as not to waste (especially the cloth with a lot of lights and lighting if not practical, we must also try to avoid tandem use, waste electricity), but some places can not be Province, for example, next to the bathroom mirror, hairdryer and shaver to often; well inside or below if the shoe has a socket is good, can bake shoe device, I now regret not quite this wire cloth.
107, the bathroom as wet and dry area, if area is small with a pedestal like (special glass basin was dirty, lazy with caution); conditionally set a waterproof cabinet incorporating small debris is best, what is put certainly does not look good on the outside.
108, wood glossy white paint brush when the polyester better than the Nitro (which is to listen to seasoned painters speak.)
109, the cabinet must be carefully chosen, compared to more than a few quality, we go to do a solid firm, because this one is easily thousands of ocean, and related to the stove and sink and so on, so it is still not to indulge in corrupt cheap good. But best not to do in the cabinet table or inside the trash; there is, if funds are limited, basket, basket seasoning, rice bucket of what you can do all of these components in the cabinets sell the company in general is very expensive.
110, wardrobe rather more not less, rather big not small, the women remember! Dangling from the longest space to be able to dress down.
111, such as glass or mirrors not handling things the best buy in the neighborhood, or first think of a good means of transport.
112, curtains, furniture, household appliances in the whole approach is best and then made to match the overall style tone. However, before cleaning can track installed.
113, gas change management best tiling complete, or there may be damage to the wall. Best to let the gas company to draw a chart or on the wall as a symbol of the company to be required because of the cabinet body openings in the cabinet.
114, cabinet installation time is longer, anywhere from 4 to 5 hours, or more than 2 days, must be psychologically prepared. Installation can check whether the material is used in the kind of set you (the hinge hole can be seen through the cabinet material). Before installing the kitchen cabinets before cleaning it, because once the installed cabinets, no way those dead ends and then cleaning up.
115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes on the choice, I was not looking at the results of the small distance between the laminates, hang clothes stretch not open, even after the adjustment.
116, taking into account the formaldehyde pollution of the environment, such as spider plants can be placed in the green room, furniture doors open all the emission of odor, but also to buy something special spray to eliminate odors.
117, installation of combustible gas, booking gas ignition.
118, Brush Wood of the time: the best Puwan other rooms painted tiles or wood flooring. If you must brush, the best have to clean the room. No floor tile or wood floor room, the room a lot of dust, then brush Wood, then brush off the dust easily attached to the surface of wood products Wood, feels a tingling feeling, although this can be higher label and then brush again sanding solution, but in the end it feels to feel the brush and the overall effect will be a deduction RBI. Puwan brick room after the brush, when the dust content in the air before the shop a lot less than the basic Wood does not appear again after the dust brush attachment on the surface of the wood products. All that being said, because a small renovation to hit the Wu family situation, I had decided to buy in Canada Wood hi seen it before the effect of brush, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of effects to play a lot of discounts, it has been named Wu regret things. And I buy in the organization hi the process of adding paint, some students appeared in this family. So to remind students to take note of here. Wood I do not know whether the other case, but according to the principle of same reason, so here to remind students to pay attention to it.
119, on the fill paint: painting teacher pay is so dry wall putty finish and then approved, the putty is dry paint. After brushing paint loaded if no reason is necessary to switch the lamps and various electrical appliances. Ask someone to install lighting and electrical switches to remind the teachers to pay attention to this and a clean install Sin before hand, so that when installed will not be a dirty wall. Will save a touch-up painting processes the. Of course, smeared the walls, the decoration is to make sure the paint division teams to pay up painting again, that is, the walls will get dirty clean (if it is paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint.) Just note, do not let install lighting division to pay soiled walls, paint can make teachers pay less for a trip (or at least half a day), but also facilitate a lot of our own, and why not? Sometimes, with people easily, also has been easy. In general, a house painter will paint before brushing the Wood, Wood to do so is to avoid the process of dry brush would paint the walls of the wall impact. Of course, in actual operation, you can also Puwan after tiles (floor tile wall of the putty has been approved before the good) painted Wood, Wood, etc. after whitewashing paint dry, but to do so, of course, will affect the duration. If the fear of affecting the duration of the case, but also the impact of the air to minimize dust, then point to a lot of diligent to clean the room, the health of the.
120, decoration team choice: As the first company selected the guerrillas or the regular, I think is not important, the key is to give you the head of the construction team is responsible, the technical renovation of the workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than four, for the most part is this, if your time is very rich, it is another matter. And decoration companies to talk about this before, must be clear that you have to do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the various factors and decide what the next items you want to outsource , which items to decorate the company to do.
the decoration of the people, the decoration of the offer as low as possible, of course, contrary to the views of decoration company. Sometimes the decoration company to La Shengyi, will offer some of the weight of relatively low, this way, the project quality and the quality of materials is more difficult to guarantee. Renovation so many, you want to term items are the lowest, it is unrealistic. And the renovation of the offer, you can not just look at numbers, which also depends on the content of the materials used in this project, specifications, brands and so on. You know, the decoration of each of the quotes are actually quite an art to.
121, the construction? As I am not eager to stay, it plans to look for casual workers: your neighbors a good home builders are likely to become the object of my looking for: a mason, a carpenter, a plumber, a painter. Designed to do step by step step by step, I believe, working slowly and deliberately.
122, to use every penny wisely: look at the decoration materials, he must be looking tired, there are so many good things, it seems, like every single look, and economically able to withstand . A short period of time to make all these things can be purchased in place, the economic pressure is so big. Most people at this time is often in disarray, the results of the last one too much over budget, the second is the U.S. price of the first things to buy high quality, then buy something is mixed.
My view is:
one pre-determined price, after the election materials.
excess of the expected price of 10 percent-of material goods, do not waste time. Business is always fine too buyers. I am doing a detailed schedule of materials needed in the future will be posted in the post for your reference.
Second, you could save on the province, the flower to flower.
the most expensive place is carpentry, kitchen cabinets.
most prone to water quality problems is the transformation of the place, kitchen and toilet water.
123, the cost of furniture than to buy some furniture. 500-700 yuan per square meter of ordinary furniture.
124, covert project was not to save money the most important place: the circuit transformation of water, water treatment.
approach is to ask B & Q to do, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water 40 yuan per meter, the circuit 20 yuan per meter, with six months warranty. Details of B & Q on the first floor in the east of the individual services and pricing announced, we do reference
125, the most hassle free way is to use online resources, the collection, retention, sorting integration, will certainly be useful when.
126, in order to save time, improve efficiency, each has a gain on the decoration materials market, a detailed and practical procurement schedule and budget is very important.
list by room category procurement plan is easier to implement: each took to the streets to see things the same room, to facilitate comparison and comprehensive
together, likely to have success.
one hall project
Second, the living room works
three, four restaurants engineering
, master bedroom project
five or six children
housing projects, study projects
VII, the main Health Project
eight, nine passenger
Health Project, the kitchen works
ten, eleven
balcony engineering, engineering
Yin Taiwan is now put my own plans like the table set out in the following post, for reference: data in the table as an example. This list is used as a procurement plan
more convenient, pre-construction projects may be appropriate to re-classification by type of work merge into masonry, carpentry, electricity, water, paint and other re-tabulation. The right side of the table can also add If (emulsion paint three batches of three brush; shoe plate by Albert, brush polyurethane varnish) and so on.
127, home theater rear speakers, the sound cables to be embedded in the living room below, this is very important!
128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.
129, toilet, kitchen need background music, audio and audio wires embedded before the renovation.
130, both sides must stay on the balcony outlet, Chinese New Year lantern, good power.
1: the bathroom is divided into 2 areas of wet and dry on the wet area to drain better
2: If you are burning natural gas water heater attention to the bathroom to have adequate ventilation to set
3 - 4: If you do not know if friends can ask a professional chef, accompanied by the now more than a lie.
11: hydropower is still looking for professionals to help themselves because the functions in this context also inform the design of their own lives who need to be transformed in the transformation of migration, but if there are problems when the house until you have installed the
line problems and have to re-do the wall torn down was a very big head thing.
12: waterproof bathroom of their choice should depend on the bathroom floor tile floor tile professionals are there to do this in the purchase of water treatment can rest assured that when you do bad, but because the waterproof design problems in the choice of size If you encounter after the designers got the idea that he would not cut off the bricks to fill the ground so that you destroyed the original measures designed to waterproof tiles tiles of course, this is the early you can find, but not out live in your home is a few decades we need to ensure the long-term design, so you must pay attention to the bricks in the pavement without being destroyed
19 when the combination is now bought ready-made cabinets are the most directly is because the family The water issues need to be close to create the design, of course designers in addition to circuit design but also inform the designers set their own homes who are often under the kitchen cabinets so the scale to better determine your cooking at home more comfortable to use sheet metal cabinet recommended to choose such a large load to bear safe
tile sealant and not the same as the use of white cement, but the masons usually use the method fill fill white cement tile sealant, so that Time to go on sealant, sealant pointing to a little bit better and not dry the paste to the wall. Also, cabinet hinges, the pool water, switch and so use the good, the cabinet material, pool cell body, pins can be used in general, of course, if you will not care about the money.
large package if not, I suggest to buy building materials to the east as far as possible to their homes, actually the home, B & Q to buy such a place can be returned.
131, at the entrance to the light switch, we recommend using inductive type. Black day home, save the dark.
132, note 1 foundation construction, water, electricity transformation
(a) before entering the construction crews on the water to minute test, before they are allowed to change management.) and can knock down the plaster layer, load-bearing walls for installation on the
(c) in the buried line of control If the original line to be changed, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong electric
(f)
133, waterproof
(a) kitchen, health,
(b) 30 cm away from the wall to do it twice, more than 30 cm can do it again, wrap need the waterproof door pocket door.
(c) waterproof finish to be dry, the Redo waterproof layer. Most likely the leak is the
134, tile
(a) the owners is required in the selection of tile for tile quality finds its way: first, to see its color is uniform, non-mottled black spots and small holes the line; followed depends on whether the standards of its size, the amount of tiles with a tape measure the length and width, measure out the size of the factory size to be consistent with its trademark, the diagonal and then the amount of the tile, such as the diagonal line, then the tiles is positive; then look at the flatness of the tiles, the most simple and effective method is to tile the same brand of two overlapping positive and negative, such as overlap significantly after the gap between two pieces of tile or you can rotate the tiles uneven; last look There is no color tiles, the method is to take out a few samples of the same type of tile, in the light are compared, such as do not see the color difference can be ordered.
(b) After the tiles stick can not have a whole piece of brick hollowing (local hollowing whole piece of brick can not exceed 20 percent sign), if the needs of the entire film Brick hollowing rework normal circumstances, Post 100 per brick, brick wall tiles are allowed to have a hollowing, brick tiles are allowed to have two hollowing, but must rework, rework the main material (already counted in the loss within) from them, such as Over this range, the main material responsible for the construction.
(c) Under normal circumstances, the level of tile degree of error tolerance of 2 mm, the gap to be consistent with tiles, bricks and tiles should be flat on the corner (allowed error of 0.5 mm), kitchen, health and brick wall in addition brick and tiles should be flat on the corner, the need to level degree (error to allow 1 mm) and vertical (allowing 2 mm error) to achieve, bathroom, balcony tile floor drain should be considered, you must first put away slope, if there is no special reasons may not have water.
(d) in the wall and floor tile Puwan required after the
135, anti-termite
(a) kick down the walls and the trough in the garbage after, a comprehensive anti-termite (termites sprayed the whole house that drugs)
(b ) After the entry of all plates in need of anti-termite treatment (specifically made for wood termite category)
(c) required before wood floor shop to shop on the ground to do a wood floor termite
(d) termites spray to wet the drug is preferred (you can clearly see the wet)
136, the calculator is also a research dollars, and now the calculator has multiple functions to set the decimal point, making operations will have different standards when, so we need to bring a calculator yourself, and now mobile phones have computing capabilities, but the functionality is not good.
137, two better prepare themselves neutral glass, plastic (1 clear, 1 white), recommends to the General Electric Company, B & Q for sale, 49 a. Pretending to bath room, sink, cabinets, security doors when they need it. While the general factory installed package will come with glass, plastic, glass plastic, but most of them poor quality, easy to change color or mold the future.
138, if not a last resort, do not use toilet seat shifter. This stuff is very likely to cause clogging toilet bowl water.
139, Lvkou Ban kitchen, two above the hood, open the holes we have to wait a good hood completely up security after installed. An early and I go home, and later removed to install hood Shiyou, apart and put them all out of shape by workers, seamless ceiling has become a ceiling joints.
140, if the purpose of uniform appearance, is also fitted kitchen and bathroom doors, and that soon after the installation on the door marked with the ground glass joints where glue. I do not have time for processing, water workers are not careful, a lot of water splashed on the ground infiltration to the door frame, the following part of it has been a little black (mold) of the.
141, must be tiled balcony! King balcony to angle around to shop, shop to life and railings to the balcony the same height. My view balcony to balcony wall angle and the life there is no shop, had prepared a bucket of wall paint, refresh yourself on a regular basis ... ...
142, sealed in the wall of water reform must allow the decoration to provide detailed master water map.
143, if prepared to paint the wall color in the electronic transformation of the time necessary to take into account the problem of lane changing. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the entire line, but the wiring. This wiring must be installed where the whiteboard for future maintenance. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~
144, which is the lowest level I made a mistake, I assumed that the bed 1.5 m width is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside cabinet to stay well behind the lamp socket on the wall. As a result, there is no way to block the outlet used to be.
145, started before the captain to make the decoration of the wall how to deal with the need to shovel out all the original powder. In particular, ready to paint the wall works outsourced to the company's students. My family is contracted out to paint companies, such as woodworking look after painting the walls gray only know that it is bad, it is best to shovel out the whole re-Pihui. However, wood has been done, to shovel out the ash is not good the original operation. Finally had to brush the surface of a layer of glue Pihui 108.
146, increase the line must be re-wiring. But the terminal from the nearest branch wiring. The increase is not allowed in the original wire connector wiring.
147, air-conditioning control switch only in the power supply side. Added on the line is not allowed.
148, change the location of telephone and network cable, when the original fabric of the line can be drawn to continue to use. However, if the improper construction there will be many hidden dangers. So the best room of the weak from the box to be replaced.
149, measurement circuit transformation workload is generally in accordance with the wiring in three different ways were measured.
(1) play slot pipe (at trough length measurement, if a tank with multiple root canals, calculated according to half the number of tubes. The other half included in the overhead lines.)
(2) overhead line (wearing tube not play slots), calculated according to the length of pipe.
(3) for cable, according to the number even if the number of replaced (replaced the line to tell the construction team do not throw).
(4) weak reform, according to the first method. The difference is who should pay attention to the weak line is purchased. Owners will have less to buy wire prices.
150, how the toilet fixed to the floor, hit the screw with it? There is convergence at the base and pipeline, to buy what were sealed and the outside is better: the toilet was fixed with expansion screws. Convergence at the base and the inside of the pipe with a special sealant toilet. Out of white plastic with the deployment of white cement + water slurry. When the toilet is generally purchased with a special sealant.
151, buy materials, we must first calculate your approximate usage. To buy water when the material to do anyway, after thinking about a painting materials by sea chart in the end how many came out, so little trust in a moment the foreman, the result was that buy the water 5 meters, the actual use 27 copper head months, actually bought a 40, should the remaining 13, seven short of the actual remaining 6. Under repeated questioning of the foreman back from the other site Details of their pre-calculated circuit material, the calculated results and after comparing the request of the foreman: wire from 12 meters to 30 meters, cable 13 meters from 20 meters to the other, such as insulating tape, plug had great access was I correct ... ...
152, if there are old water pipes under the ground, in addition to switch hit, it tends to be damaged, do not hesitate to be the laying of new, do not save, to ensure safety .
153, bathroom walls that retraction of the glove do not waste space, and posted a very good very nice tile. Of course, that tile union trouble saying
154, do not use tile received positive side of the line angle to 45 degrees splicing bricklayer before grinding pretty, of course, you do not choose Tijuana workers lazy way to do things.
155, aluminum pipe, when installed must be sealed cement workers in the supervision of the construction standards in accordance to the hot water pipe Reserve space for expansion. Short plastic tube not closed strong, and loose some of good thing.
156, the bathroom floor if higher than the hall, the transition can be used to solve the door stone.
157, plus move the sewer pipe mouth, then the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.
158, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see the effect of significantly different .
159, buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.
160, the color of brick is hard to find satisfactory, and I did not find, however, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is indeed the bricklayer himself put forward good suggestions.
161, under the supervision of the ground water repellent to use is not in accordance with the requirements of my bricklayer but directly poured on the ground, it can even do! It is not the best yourself, do not bother but assured.
162, the slope of the bathroom floor before tiling to consider the good, the slope is not in accordance with national standard to achieve the effect of rapid drainage, and if you use a deodorant or a thin floor drain floor drain will be greatly increased drainage problems. Some people say that steep slope and pretty, I think it is nonsense. Instead larger slope can quickly run a clean water is very soothing thing.
163, the LG door with platinum point fire board, the effect is good, but might consider if we made the decoration finished door. The door by hand is not refined, for reference only.
164, sink big market brand-name price is not cheap, brand-name quality crazy bad.
165, the balcony door is best to use the same type of fire board. Balcony environment is harsher.
166, bathroom vanities and cabinets to do when they have to consider the size of basin lest good fit in the future.
167, the glass is heavy stuff, the best buy in the neighborhood, or first think of a good means of transport.
168, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.
169, matte paint is high and light is beautiful, do not listen to the painter, and if not brushed matte painter, said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not lying to you
170, insulating tape and Teflon tape in the store to buy another large supermarket was much better quality, and full weight, conversion down the price is not expensive.
171, if the re-decoration will be used instead of talc putty finished, no big reason is that finished product easy to use putty. Especially after the painter fired when their own experience diy - talc tone putty sick of it.
172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside the use, electrician recommended a new one on the interior, and now that he suggested this valuable. On the interior door is not bad, it really easy to use!
173, large decorating company directly to the workers on site clearance work may be more appropriate package, and better technology, tools, more
174, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.
175, the audience delicate pots pots than on stage, good-looking, good cleaning.
176, basin faucet with the audience to pay attention, taking into account the basin edge thickness, leading to the mouth longer.
177, the hole in front of the toilet installation is a big, large floor drain cover can fall off, if you have installed the toilet floor drain is not installed, do pay attention to floor drain cover, or the floor drain Ye Hao lid kept it up elsewhere.
178, buy silicone, then the absolute best all imports of GE, GE followed by Shanghai packaging. Of course, if very important place in the 7,8 element that can also be used, such as aluminum window frames with internal Jiu-level waste to plug the whole silica gel. However, all use the bathroom GE silicone kitchen, value for money!
179, triangular valves should not be omitted, and save much money, if the words of the triangle valve, triangle valve to be installed in advance of copper joints are not leaking, if not installed, then only the last copper fittings installed on the faucet to take over the child when it was installed to check whether the internal leakage, the total leakage to pressure some time to test it, and install internal and less safe if the lead.
180, even in the diary has been renovated to be done about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the realization of your ideas, to rely on them.
181, fitting the biggest problem is communication!
182, little place, kitchen cabinet door type designed, BH. L-type should be designed.
183, general decoration, decoration companies, excluding the formal management fees, taxes, fees accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.
184, go in the kitchen on the ground outside the pipe, that is, from home improvement to a time bomb, who say where Shashi Hou himself in trouble.
185, if the separate tube wear, but in a tank of great? Effects can endure
186, ask what the restaurant and living room are separated between the most cost-effective package Door, side package only 6 cm, or contaminated with white, height 2 m, was not large High crude.
187, strong and weak power transfer to each tube, to separate the best way, keep the distance of 10 cm or more, but it can be difficult, because most families in order to save costs and to open a slot. Weak audio line can penetrate the same pipe.
188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to no pungent odor. In fact, you are using a good wood core board, do not deal with furniture inside.
189, the cabinet can be 15 cm plates and wood core board, the back of the five available folders, Wuli. Package doors and Tizi use nine per cent. Different materials with different techniques.
190, PPR pipe not only for cold water pipes, but also for hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tubes together, so once installed suppression test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never rust, never leakage, green high water material.
191, paint board is good, the advantages of both wood and composite.
192, do not print for a long time on the wet artificial stone, unless you want to dry a printing surface; they should not be long-term wet cutting board on the table. Wet wood is sometimes fade; rub the stain with a steel ball, like hand squeeze pimples.
193, can use an ordinary gas meter in the cabinet door closed it? Need to use the shutter-type door it? Check regularly open air on the line.
194, clear contracting the tx Please note, we must verify the renovation team give you a list of materials. Their estimates may be me, I too believe that they, and the results of wires and line to buy is almost doubled.
195, the size of certain planned sanitary ware, the best sketch in advance, calculate the size.
196, students pay attention to the door to buy products, if you want to pursue results support the panel with the business package Door, then you may have to be Henzai knife it!
197, Re: installation of water pipes are put before the leader and basin, sink have bought?
not, just make sure where is the basin faucet, bathtub faucet, washing machine what's on the line leading, leading 99 percent sign and fell into the water are in line with international norms, as long as workers are not careless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. Tank to determine the amount of units before a good size, fitted units Haojiu Hang bought before, do not forget that the audience or on stage. Distance between hot and cold water pipes with cement tiles must be accurate before the closure of 15 cm, and must be parallel. If you have bought, it is best put something, such as sealed after the unload.
198, if an 8-core cable at the same time take the phone and network, will not interfere with each other it? Not. 1,2,3,6 hit cable module, 4,5 hit the phone module, and the other two easily. My experience was right: 10M by 1236 100M in fact used to have the speed to 10/100M that we will not feel any different. If a 8pin line, then the signal will cause some program-controlled switches on the network signal interference in the home environment generally will not have any problem. But rest assured that I can recommend such a route will leave separately to the margin, the network cable is very cheap that you say?
199, be sure to check the distribution box installed properly.
200, fitted bath and shower faucet lessons connected to the faucet pipe is embedded in the wall, and I repeatedly told them to size to get accurate, not to pretend not on time. The results left a hot and cold water is 15 cm spacing, can be hot and cold water pipes are not parallel, the result took a plumber just put on the force feeding. Yesterday discovered that my fb leading high-temperature coating device actually does get cracked. If we can first load leading to the first installed it. Leader should be bought first, then install hot and cold water pipes, tiling it. Oujia bought early leader, is Oujia master to buy.
2, bathroom, air conditioning, no outlet design switches. Especially the bathroom water heater, a pair of level switch with a plug appropriate. To off to electric, pull the plug dangerous
3, on the brick part of the treatment of sun angle, the final analysis is to look at the workers level. If the level of good workers, plasterers, and better tools for grinding ceramic tile, they should not hesitate to choose the practice of grinding a 45 degree angle. In effect, as long as a good grinding, grinding angle of 45 degrees in the positive approach is the most beautiful! If the level of the workers do much, then you still choose to be positive angle, because the bad grinding angle of 45 degrees angle of approach is not as yang effect of article.
4, line up the pipes after the water pressure test is also very important. Test, we must be present, and the test for at least 30 minutes or more, conditions permit, preferably an hour. 10 kg of pressure, without any reduction before the final test.
5, when the steel doors steel door must be considered a good size wall frame protruding inform the installer, making the final frame and affixed to the wall tiles are flat finish, so not only beautiful, and good health to do.
6, carpenters and masons of the package Door tiling is to tie in, including door pocket of the time, to consider the following ground (the ground side of the door either side) is also affixed to ceramic tiles or other cement mortar matter because the door pocket before the nail if the tiles stick better, has packages to the ground, with cement when the future, if the cement and Door stained, moldy water will cause wood Door
7, under the mattress and the bed board must be breathable. Bed board is best for general use cedar board
8, do the paint as much as paper tape
9, buy a lamp to note: General tried to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other coatings plated iron above, ah, ah nothing like paint, easy to fade.
10, washbasin as ceramic pots, glass pots downright Health
11, water and electricity to its own transformation plan, and ask them to open Cao straight line. Watching them draw their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.
12, water must be good, be sure to test the water!
13, many of the construction of a verbal agreement into the gap checkout slaughtered, must be written in black and white, a change in the project are sure to ask what the price, write it!
14, ground floor, if installed, to re-do all the ground re-smooth layer of cement.
15, the kitchen door, or to make a wooden decoration hanging rail wood doors for good.
16, the living room as much as possible to install the power plug.
17, is still to be done outside the bathroom shower partition. A shower curtain can not pull the easy way wrong, real inconvenient, water everywhere.
18, do door and frame materials to choose fine grained materials.
19, before installing the cabinets must be sure your home water is OK.
20, kitchen floor tiles will not pick white.
21, ceiling, pay special attention to smooth putty before wiping Dulux
22, the number of living room lighting should not be too light, simple is better, or like the lighting shop!
23, to buy things that need to be installed as the installation requirements of sellers, it does not include installation, it must adhere to only pay the full paragraph after the installation! !
24, the renovation period, before you collect from business card manufacturers carry
25, Lvkou Ban the protective film is best removed before installation.
26, shoe is best to use shutter doors, deodorant. Edges can leave a shoe outlet, to plug drying shoes.
27, cutting and a small safe place to light.
28, it is convenient restaurant exhaust fan can also be safe, so when you eat hot pot or do not dirty barbecue houses the Office of the ceiling.
29, the door is best to arrange a place debris in the cabinet, can be placed on top of shoe. The common things, such as umbrellas, bags, scissors, change, eat the medicine, and so on there, so it is convenient.
30, there is no need to use your ceiling, if not too worried about moisture and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, my health to do a guest, very beautiful. If you must use Lvkou Ban smallpox, it is recommended:
1, not too expensive.
2, using the net color, especially in the kitchen ceiling, white on the good, the color white unless and decoration style match, it will easily inconsistent.
3, download their own ideas, do not believe selling the vision of smallpox, their vision was widely soil.
4, staring at himself in the scene, closing side is very important, do not let them slack, or leave a black seam, how to look how ugly.
31, the third day and continued to stick largely perforated tiles, range hood, and water heaters to pre vent lay, and if so then perforated tiles stick better, not easier. Therefore, before the renovation must be selected in the range hoods, stoves and water heaters, to determine the size of punch.
32, although taking into account the custom-made cabinets look good, but not durable, comprehensive views of some of my classmates online and experience, to counter the framework of using cement to do, inside and outside the sides stick tiles, marble countertop shop, wall cabinet and cabinet wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And spent another few. Read a good many of his neighbors say, I did not blow.
33, well after the door pocket, plasterers plaster line to start the installation, wall Pihui works. Comparison of the wall of my house was originally formed, approved 2-3 road on it. Pihui granted when a gray polished once, and then brush the primer, sanding again, after brushing, and finally twice with ICI paint brush, the entire wall looks smooth and flat, really good. Upon completion of the ceiling wall, a carpenter started wardrobe. Albert wardrobe is 18cm's license Daixinban do paste veneer outside, although there is no furniture store to buy so good-looking, but durable, quality should be better than to buy. I'm not afraid of standing container board. I am afraid that is not enough to buy. Backplane is relatively thick, buying is thin.
34, other students in the tiling must pay attention to the following points:
① best he can in the scene.
② some less than perfect tile can attached in the future some workers do not see the location, such as cabinets, sinks, mirrors behind, but also pay attention to tile, brick, etc. Do not waist is more than the workers attached to the position, otherwise You can not see anything in the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the flood damage must be enough time.
④ sure to floor drain plug with something good out of cement down to prevent clogging. My family just because off the cement floor drain is blocked, and spent 30 looking for the management office to clear, get up a lot of small mud.
⑤ people at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of bricks, it is the heartache, all the blood and sweat Mimi Yeah.
35, a wall of long, high. Such as a bathroom with four walls, each wall should measure out of its long, high. And then deducting the area one of the windows and doors. Finally, a numerical ground area. After the size of the amount you can also get a sub shop selling tiles, they will help you re-match. Loss of 5 percent-plus on the line.
36, the best is a two bedroom dome light control, and a door, a bed, lying on the bed save the winter and then it turn off the light.
37, the socket must be considered a good location, height, interval. Even first met playing steel cassette position, the latter is found to just be put away the magazine TV cabinet, microwave ovens, desks block, had to move the location of the first two high furniture, and eventually found not only ergonomic height, but also can not buy a good fit stainless steel cabinet legs, can only be made of aluminum foot.
38, just around the corner in the hallway of the tube with a good, bright and have that effect.
39, did not take into account when loading the table lamp placement, it lights not in the middle of the table.
40, bathroom tiles do not use too much pigment, one easily dirty, and second, a long time, too dull!
41, outlet to more equipment, furniture to buy outside the ground to dirt security to consider, like to see more housing, in principle, should adhere to.
42, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see significantly different results. Buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.
43, the color of brick is hard to find satisfactory, and I did not find, however, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is indeed the bricklayer himself put forward good suggestions.
44, on the balcony on the top cupboard, then hit the back of the cabinet with a layer of waterproof insulation foam board works well. Balcony door is best to use the same type of fire board. Balcony environment is harsher.
45, if no suitable molding may wish to custom, custom quality seems better than the sample also. More personalized and customized.
46, bathroom cabinets with stainless steel legs are huge profits to find some local stores to buy back price of mad cheap.
47, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.
48, Paco the floor well, I like only to remind the boss about the price may be directly to a salesperson about the price ratio and better.
49, matte painting is beautiful than the high light
50, if the re-decoration will use putty instead of talc products.
51, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside use, electrical proposals put new ones in the room, and now that he suggested this valuable.
52, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.
53, the audience delicate pots pots than on stage, good-looking, good cleaning. Basin mixer with the audience to pay attention, taking into account the basin edge thickness, leading to longer mouth.
54, without any modification of the wall angle is also very beautiful, but to advance the stage of looking for the painter and the painter clearly put forward. angle Ding Jiaoxian do help to play the straight line.
55, online slots before the cement surface, surface treatment approved putty is very important, for no solid surface with a clean ball handling is very appropriate.
56, make plaster suitable for a large hole on the wall, of course, if the hole is too big or need to use cement.
57, frosted glass on the back do not coated with paint to protect the hard to clean!
58, Caipen leader can be sure to switch back of the hand, that must be not easy to keep clean fingers, hand turn up when the oil is also difficult.
59, the price of luxury auto racks too much water, and found a number of relatively unknown brand in the structural design on the front line rather than the brand, the price is much lower.
60, could be considered safe on the ground of the metal socket, this socket 100 is very expensive, but very convenient, usually flush with the ground, the foot can plug a foot to pop up. Suitable for large living room. Or on a dining room table, below, is used to insert hot pot (to prevent hanging back and forth when moving wires)
61, storage room. TX has been said, but I did not do doors, looks very beautiful and easy to put dirty clothes in the cupboard.
62, starting bed frame (which is so called up.) I am a professional company to buy the cloth-bed bed, and spent 350 yuan plus a such a thing, end of the bed there is a pull handle, the bed board will be turned up, exposing the bottom of the storage space, what a great Oh!
63, is not practical double bar towel rack! Current and single-pole uses the same basic level does not look inside and then drying towels hanging pole
64, inside the cupboard that the trash is not enough practical, than on the outside. There do not install the door panel of the trash bin and table, open the door when the summer will be very smelly. Trash or on the outside good.
65, the table next to the small cabinet, and can be placed on some stuff, very convenient.
66, to I think the mop bucket less demanding in terms of performance, one can assemble themselves out of covered and the surrounding environment that is consistent with tile or mosaic appearance, and money.
67, the bathroom can point nail nail to hang something in the hook.
68, designed a bathroom cupboard put clothes, no longer have to worry about bathing forgot to clean clothes.
69, washing machines with drying is not serious and practical, in addition to one year, only the yellow mold-day, and the evil giant. Thick clothes, towels or drying quit, let the sun consumer disinfection to be good. Even overdrawn, you need to save the point of silver.
70, even in the laundry room to do a laundry tub, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundry tub, became my most frequently used a washing area. What rag ah, ah socks, and towels, ah, all washed in it, and even most hands there too.
71, fitted with lights really not practical, the decoration done up to now not opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under romantic, and now do not have much chance of opening spot.
72, the biggest lesson learned is that in fact the simpler the better fitting, less pollution, less money, peace of mind.
73, useful stuff:
① designed storage room.
② wash the dirt used in the north balcony of the sink. Differences between the washbasin and toilet and washing vegetables for the kitchen sink.
③ bathroom can be pulled out of the leading shampoo. (TX shampoo basin was never an exception.)
④ easy to clean the floors and the appropriate cleaning tools.
⑤ work lights the kitchen table.
74, buy a toilet must be a good amount of their own pitch, or go buy a return that is really ... ...
75, Bath and Kitchen floor tiles stick better after a good amount of what the former did not do the level of the lowest point is not looking at the floor drain, or other teams did and decoration after passing, a lot of dead cells.
76, window beads Angeles with the Great Wall of stone tiles is a 800X800. Manufacturers cut and edging, Mason posted. Pattern did not look good also
radiation.
77, bathroom shower room must be large enough size, and use transparent glass, shower in it will not seem so cramped.
78, should not use white cement tiles pointing hook. Did not become a black month gap, ugly death. The results they have bought their own hook pointing agent, that tired
79, the cabinet should be pad under the artificial stone after the board, with the result that there is no installation, it can not cut the meat in the above, promised to give me almost two months have not installed installed (only to polished once).
80, do not confuse the letter designer. Of course, you can visit several decoration companies and more, from the design in each extract something truly useful, the key is what you want to dress up like home improvement.
81, if the floor drain has been installed by the original developers that hinder foul of the
82, bathroom tiles affixed to the ground after a good test the water, if water is relatively slow to rework immediately. Our household's water is relatively slow, then relented a bit, it was always a little bath water, and made hundreds of our main Guardian have idle money in the shower head, and wonder how the total now relief.
83, fitted wash basin and mirror to be considered good, put brush cup shelf, towel rack relative position.
84, bought the mirror to consider the position of mirror front lamps, and if do not want to install a temporary mirror front lamps, mirrors the size of the cover for the mirror to be able to set aside the line of the best light.
85, put washing on the balcony to be a small cabinet, easy to put some debris, such as washing powder within the debris. Both beautiful and practical
86, must be staring at the upstairs upstairs to do down the dripping water .... otherwise, get the wall cabinet, the wall is a mess ....
87, do not blindly follow the online buy, I later found that some themselves to buy cheaper than the bargain.
88, TV backdrop will set up a few more outlets, TV, DVD .... a put, you will find enough outlets.
89, change the water well in the future to be considered before loading in the wash basin in the bulk sample, for example, the left or right pots pots, water and drainage that is located in what place. Otherwise, changing for the better after the discovery phase of the wash basin was not fit!
90, on the curtains, we had better put your stay a size goes, the boss can not be less that size. If less, then, how how the. Or watched him cut his cloth.
91, the decoration of the construction process:
(1) approach, breaking down a wall.
(2) bathroom, kitchen floor to do 24 hours of closed water tests (required the developer to complete this task.)
(3) cutting trough, water, electricity transformation and acceptance.
(4) sealed underground water hidden trough renovation project without closing the water leakage test started waterproofing.
(5) bathroom, kitchens wall disk.
(6) Carpentry approach, suspended ceilings, plaster moldings.
(7) packages Door, window cover. Making wooden cabinet frame.
(8) simultaneous production of wooden doors, plastic doors and even pressure.
(9) wooden panel paint brush dust (edible vegetable oil).
(10) leveling the table laying marble windowsill.
(11) wood trim panel, pasted, fine line production and installation.
(12) wall primary treatment, grinding, leveling.
(13) belongings, the door seams paste stickers (protected side).
(14) ICI oil for at least three times the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, skirting.
(17) lighting, sanitary ware, handle, door lock installation.
(18) clean up, floor tiles make up joints, dismantling.
(19) decoration preliminary acceptance within the company.
(20) three formal acceptance of appointment, delivery owners.
92, flue gas valve back together, be sure to clean and ensure the valve can switch freely and to able to open to the maximum, otherwise it will affect the effect of smoke hood. To remain in the installation of two ceiling is not installed, so hood and try and correct installation of the ceiling and then installed.
93, so much in the living room and dining room ceiling can not do not do it.
94, good air conditioning in order to take the line position, the power closer to the air conditioning as much as possible, so install air conditioning power cord to see part of it, leaving a trace of regret.
95, to personally measure and record all the available house sizes, size map will be covered 楼书 units and then re-wire tagging, the final size will directly affect the interior design and furniture purchases.
96, line a bad choice if small size of the black walnut is always enough air, then need to have choice, or to accommodate actual or attached their own ideas, of course, be both the best
97, began looking for decorators. To personal experience is concerned, if not particularly large size and intended to simple decoration, it seems more cost-effective to find some of the guerrillas. After installation it is best to introduce people, you have read and agree to the eyes, especially the feeling of the person in charge of the decoration is more important, responsibility and appreciation of how, some of the former is more critical, because if only a stripped-down, in fact, those who live almost on the outside will do mix, but the quality is good or bad may depend on a sense of responsibility.
98, the main furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. had better take a look in advance, if the running around on the tired, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so the next thing you do is based on their desired style filter out the right things slowly. Some people take good style, while others grasp of color standards, it does not matter, anyway, there is time to consider, if you wait until clearance decoration, furniture, help wanted steps to go in the final will reluctantly accept the inevitable and not very much.
99, has been optimistic about the furniture of the best down to size and then to display the future situation of the virtual room.
100, the necessary documents to buy something good must be preserved, a move that may exist on the post-retirement, a replacement will definitely benefit. In particular, some important items of the store receipts, brochures, etc., because a lot of things have a warranty period, the evidence lost would be more trouble.
101, during the construction projects are sure to increase or decrease the price they asked for and then write it in black and white.
102, check whether the construction is necessary protective measures, such as entrance doors to use pearl cotton wrap, a good window and floor tiling also appropriate protection.
103, as much as possible to communicate with construction workers, to determine whether he understands your intentions. Put ourselves in every respect the work of the master, respect him, and people feel the importance of family, and began to live to whether it is more responsible for some of it? Saying goes, is not called (But if you face a treacherous cunning bully, who, it would have to retaliate, argue) in particular to some marginal projects is the need for several types of co-ordination, co-workers will be responsible to coordinate their respective duties, Otherwise, we pass the buck back and forth, all pass the buck. Like my mason to help me solve some carpentry thing, and electrical and resolved some masonry problems. Because each teacher's experience is different, as long as he is willing to help you find a way.
104, do not do the best furniture fixed, because it no longer may be some changes in the layout. If we do have to grasp the quality, or endless trouble.
105, be sure to change the water carefully, one charge of money; Secondly, if you do not need from the floor to the ceiling laid down water pipes, water pipes in case of a problem to big trouble.
106, according to their actual needs and reasonable arrangements for wiring, so as not to waste (especially the cloth with a lot of lights and lighting if not practical, we must also try to avoid tandem use, waste electricity), but some places can not be Province, for example, next to the bathroom mirror, hairdryer and shaver to often; well inside or below if the shoe has a socket is good, can bake shoe device, I now regret not quite this wire cloth.
107, the bathroom as wet and dry area, if area is small with a pedestal like (special glass basin was dirty, lazy with caution); conditionally set a waterproof cabinet incorporating small debris is best, what is put certainly does not look good on the outside.
108, wood glossy white paint brush when the polyester better than the Nitro (which is to listen to seasoned painters speak.)
109, the cabinet must be carefully chosen, compared to more than a few quality, we go to do a solid firm, because this one is easily thousands of ocean, and related to the stove and sink and so on, so it is still not to indulge in corrupt cheap good. But best not to do in the cabinet table or inside the trash; there is, if funds are limited, basket, basket seasoning, rice bucket of what you can do all of these components in the cabinets sell the company in general is very expensive.
110, wardrobe rather more not less, rather big not small, the women remember! Dangling from the longest space to be able to dress down.
111, such as glass or mirrors not handling things the best buy in the neighborhood, or first think of a good means of transport.
112, curtains, furniture, household appliances in the whole approach is best and then made to match the overall style tone. However, before cleaning can track installed.
113, gas change management best tiling complete, or there may be damage to the wall. Best to let the gas company to draw a chart or on the wall as a symbol of the company to be required because of the cabinet body openings in the cabinet.
114, cabinet installation time is longer, anywhere from 4 to 5 hours, or more than 2 days, must be psychologically prepared. Installation can check whether the material is used in the kind of set you (the hinge hole can be seen through the cabinet material). Before installing the kitchen cabinets before cleaning it, because once the installed cabinets, no way those dead ends and then cleaning up.
115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes on the choice, I was not looking at the results of the small distance between the laminates, hang clothes stretch not open, even after the adjustment.
116, taking into account the formaldehyde pollution of the environment, such as spider plants can be placed in the green room, furniture doors open all the emission of odor, but also to buy something special spray to eliminate odors.
117, installation of combustible gas, booking gas ignition.
118, Brush Wood of the time: the best Puwan other rooms painted tiles or wood flooring. If you must brush, the best have to clean the room. No floor tile or wood floor room, the room a lot of dust, then brush Wood, then brush off the dust easily attached to the surface of wood products Wood, feels a tingling feeling, although this can be higher label and then brush again sanding solution, but in the end it feels to feel the brush and the overall effect will be a deduction RBI. Puwan brick room after the brush, when the dust content in the air before the shop a lot less than the basic Wood does not appear again after the dust brush attachment on the surface of the wood products. All that being said, because a small renovation to hit the Wu family situation, I had decided to buy in Canada Wood hi seen it before the effect of brush, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of effects to play a lot of discounts, it has been named Wu regret things. And I buy in the organization hi the process of adding paint, some students appeared in this family. So to remind students to take note of here. Wood I do not know whether the other case, but according to the principle of same reason, so here to remind students to pay attention to it.
119, on the fill paint: painting teacher pay is so dry wall putty finish and then approved, the putty is dry paint. After brushing paint loaded if no reason is necessary to switch the lamps and various electrical appliances. Ask someone to install lighting and electrical switches to remind the teachers to pay attention to this and a clean install Sin before hand, so that when installed will not be a dirty wall. Will save a touch-up painting processes the. Of course, smeared the walls, the decoration is to make sure the paint division teams to pay up painting again, that is, the walls will get dirty clean (if it is paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint.) Just note, do not let install lighting division to pay soiled walls, paint can make teachers pay less for a trip (or at least half a day), but also facilitate a lot of our own, and why not? Sometimes, with people easily, also has been easy. In general, a house painter will paint before brushing the Wood, Wood to do so is to avoid the process of dry brush would paint the walls of the wall impact. Of course, in actual operation, you can also Puwan after tiles (floor tile wall of the putty has been approved before the good) painted Wood, Wood, etc. after whitewashing paint dry, but to do so, of course, will affect the duration. If the fear of affecting the duration of the case, but also the impact of the air to minimize dust, then point to a lot of diligent to clean the room, the health of the.
120, decoration team choice: As the first company selected the guerrillas or the regular, I think is not important, the key is to give you the head of the construction team is responsible, the technical renovation of the workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than four, for the most part is this, if your time is very rich, it is another matter. And decoration companies to talk about this before, must be clear that you have to do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the various factors and decide what the next items you want to outsource , which items to decorate the company to do.
the decoration of the people, the decoration of the offer as low as possible, of course, contrary to the views of decoration company. Sometimes the decoration company to La Shengyi, will offer some of the weight of relatively low, this way, the project quality and the quality of materials is more difficult to guarantee. Renovation so many, you want to term items are the lowest, it is unrealistic. And the renovation of the offer, you can not just look at numbers, which also depends on the content of the materials used in this project, specifications, brands and so on. You know, the decoration of each of the quotes are actually quite an art to.
121, the construction? As I am not eager to stay, it plans to look for casual workers: your neighbors a good home builders are likely to become the object of my looking for: a mason, a carpenter, a plumber, a painter. Designed to do step by step step by step, I believe, working slowly and deliberately.
122, to use every penny wisely: look at the decoration materials, he must be looking tired, there are so many good things, it seems, like every single look, and economically able to withstand . A short period of time to make all these things can be purchased in place, the economic pressure is so big. Most people at this time is often in disarray, the results of the last one too much over budget, the second is the U.S. price of the first things to buy high quality, then buy something is mixed.
My view is:
one pre-determined price, after the election materials.
excess of the expected price of 10 percent-of material goods, do not waste time. Business is always fine too buyers. I am doing a detailed schedule of materials needed in the future will be posted in the post for your reference.
Second, you could save on the province, the flower to flower.
the most expensive place is carpentry, kitchen cabinets.
most prone to water quality problems is the transformation of the place, kitchen and toilet water.
123, the cost of furniture than to buy some furniture. 500-700 yuan per square meter of ordinary furniture.
124, covert project was not to save money the most important place: the circuit transformation of water, water treatment.
approach is to ask B & Q to do, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water 40 yuan per meter, the circuit 20 yuan per meter, with six months warranty. Details of B & Q on the first floor in the east of the individual services and pricing announced, we do reference
125, the most hassle free way is to use online resources, the collection, retention, sorting integration, will certainly be useful when.
126, in order to save time, improve efficiency, each has a gain on the decoration materials market, a detailed and practical procurement schedule and budget is very important.
list by room category procurement plan is easier to implement: each took to the streets to see things the same room, to facilitate comparison and comprehensive
together, likely to have success.
one hall project
Second, the living room works
three, four restaurants engineering
, master bedroom project
five or six children
housing projects, study projects
VII, the main Health Project
eight, nine passenger
Health Project, the kitchen works
ten, eleven
balcony engineering, engineering
Yin Taiwan is now put my own plans like the table set out in the following post, for reference: data in the table as an example. This list is used as a procurement plan
more convenient, pre-construction projects may be appropriate to re-classification by type of work merge into masonry, carpentry, electricity, water, paint and other re-tabulation. The right side of the table can also add If (emulsion paint three batches of three brush; shoe plate by Albert, brush polyurethane varnish) and so on.
127, home theater rear speakers, the sound cables to be embedded in the living room below, this is very important!
128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.
129, toilet, kitchen need background music, audio and audio wires embedded before the renovation.
130, both sides must stay on the balcony outlet, Chinese New Year lantern, good power.
1: the bathroom is divided into 2 areas of wet and dry on the wet area to drain better
2: If you are burning natural gas water heater attention to the bathroom to have adequate ventilation to set
3 - 4: If you do not know if friends can ask a professional chef, accompanied by the now more than a lie.
11: hydropower is still looking for professionals to help themselves because the functions in this context also inform the design of their own lives who need to be transformed in the transformation of migration, but if there are problems when the house until you have installed the
line problems and have to re-do the wall torn down was a very big head thing.
12: waterproof bathroom of their choice should depend on the bathroom floor tile floor tile professionals are there to do this in the purchase of water treatment can rest assured that when you do bad, but because the waterproof design problems in the choice of size If you encounter after the designers got the idea that he would not cut off the bricks to fill the ground so that you destroyed the original measures designed to waterproof tiles tiles of course, this is the early you can find, but not out live in your home is a few decades we need to ensure the long-term design, so you must pay attention to the bricks in the pavement without being destroyed
19 when the combination is now bought ready-made cabinets are the most directly is because the family The water issues need to be close to create the design, of course designers in addition to circuit design but also inform the designers set their own homes who are often under the kitchen cabinets so the scale to better determine your cooking at home more comfortable to use sheet metal cabinet recommended to choose such a large load to bear safe
tile sealant and not the same as the use of white cement, but the masons usually use the method fill fill white cement tile sealant, so that Time to go on sealant, sealant pointing to a little bit better and not dry the paste to the wall. Also, cabinet hinges, the pool water, switch and so use the good, the cabinet material, pool cell body, pins can be used in general, of course, if you will not care about the money.
large package if not, I suggest to buy building materials to the east as far as possible to their homes, actually the home, B & Q to buy such a place can be returned.
131, at the entrance to the light switch, we recommend using inductive type. Black day home, save the dark.
132, note 1 foundation construction, water, electricity transformation
(a) before entering the construction crews on the water to minute test, before they are allowed to change management.) and can knock down the plaster layer, load-bearing walls for installation on the
(c) in the buried line of control If the original line to be changed, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong electric
(f)
133, waterproof
(a) kitchen, health,
(b) 30 cm away from the wall to do it twice, more than 30 cm can do it again, wrap need the waterproof door pocket door.
(c) waterproof finish to be dry, the Redo waterproof layer. Most likely the leak is the
134, tile
(a) the owners is required in the selection of tile for tile quality finds its way: first, to see its color is uniform, non-mottled black spots and small holes the line; followed depends on whether the standards of its size, the amount of tiles with a tape measure the length and width, measure out the size of the factory size to be consistent with its trademark, the diagonal and then the amount of the tile, such as the diagonal line, then the tiles is positive; then look at the flatness of the tiles, the most simple and effective method is to tile the same brand of two overlapping positive and negative, such as overlap significantly after the gap between two pieces of tile or you can rotate the tiles uneven; last look There is no color tiles, the method is to take out a few samples of the same type of tile, in the light are compared, such as do not see the color difference can be ordered.
(b) After the tiles stick can not have a whole piece of brick hollowing (local hollowing whole piece of brick can not exceed 20 percent sign), if the needs of the entire film Brick hollowing rework normal circumstances, Post 100 per brick, brick wall tiles are allowed to have a hollowing, brick tiles are allowed to have two hollowing, but must rework, rework the main material (already counted in the loss within) from them, such as Over this range, the main material responsible for the construction.
(c) Under normal circumstances, the level of tile degree of error tolerance of 2 mm, the gap to be consistent with tiles, bricks and tiles should be flat on the corner (allowed error of 0.5 mm), kitchen, health and brick wall in addition brick and tiles should be flat on the corner, the need to level degree (error to allow 1 mm) and vertical (allowing 2 mm error) to achieve, bathroom, balcony tile floor drain should be considered, you must first put away slope, if there is no special reasons may not have water.
(d) in the wall and floor tile Puwan required after the
135, anti-termite
(a) kick down the walls and the trough in the garbage after, a comprehensive anti-termite (termites sprayed the whole house that drugs)
(b ) After the entry of all plates in need of anti-termite treatment (specifically made for wood termite category)
(c) required before wood floor shop to shop on the ground to do a wood floor termite
(d) termites spray to wet the drug is preferred (you can clearly see the wet)
136, the calculator is also a research dollars, and now the calculator has multiple functions to set the decimal point, making operations will have different standards when, so we need to bring a calculator yourself, and now mobile phones have computing capabilities, but the functionality is not good.
137, two better prepare themselves neutral glass, plastic (1 clear, 1 white), recommends to the General Electric Company, B & Q for sale, 49 a. Pretending to bath room, sink, cabinets, security doors when they need it. While the general factory installed package will come with glass, plastic, glass plastic, but most of them poor quality, easy to change color or mold the future.
138, if not a last resort, do not use toilet seat shifter. This stuff is very likely to cause clogging toilet bowl water.
139, Lvkou Ban kitchen, two above the hood, open the holes we have to wait a good hood completely up security after installed. An early and I go home, and later removed to install hood Shiyou, apart and put them all out of shape by workers, seamless ceiling has become a ceiling joints.
140, if the purpose of uniform appearance, is also fitted kitchen and bathroom doors, and that soon after the installation on the door marked with the ground glass joints where glue. I do not have time for processing, water workers are not careful, a lot of water splashed on the ground infiltration to the door frame, the following part of it has been a little black (mold) of the.
141, must be tiled balcony! King balcony to angle around to shop, shop to life and railings to the balcony the same height. My view balcony to balcony wall angle and the life there is no shop, had prepared a bucket of wall paint, refresh yourself on a regular basis ... ...
142, sealed in the wall of water reform must allow the decoration to provide detailed master water map.
143, if prepared to paint the wall color in the electronic transformation of the time necessary to take into account the problem of lane changing. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the entire line, but the wiring. This wiring must be installed where the whiteboard for future maintenance. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~
144, which is the lowest level I made a mistake, I assumed that the bed 1.5 m width is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside cabinet to stay well behind the lamp socket on the wall. As a result, there is no way to block the outlet used to be.
145, started before the captain to make the decoration of the wall how to deal with the need to shovel out all the original powder. In particular, ready to paint the wall works outsourced to the company's students. My family is contracted out to paint companies, such as woodworking look after painting the walls gray only know that it is bad, it is best to shovel out the whole re-Pihui. However, wood has been done, to shovel out the ash is not good the original operation. Finally had to brush the surface of a layer of glue Pihui 108.
146, increase the line must be re-wiring. But the terminal from the nearest branch wiring. The increase is not allowed in the original wire connector wiring.
147, air-conditioning control switch only in the power supply side. Added on the line is not allowed.
148, change the location of telephone and network cable, when the original fabric of the line can be drawn to continue to use. However, if the improper construction there will be many hidden dangers. So the best room of the weak from the box to be replaced.
149, measurement circuit transformation workload is generally in accordance with the wiring in three different ways were measured.
(1) play slot pipe (at trough length measurement, if a tank with multiple root canals, calculated according to half the number of tubes. The other half included in the overhead lines.)
(2) overhead line (wearing tube not play slots), calculated according to the length of pipe.
(3) for cable, according to the number even if the number of replaced (replaced the line to tell the construction team do not throw).
(4) weak reform, according to the first method. The difference is who should pay attention to the weak line is purchased. Owners will have less to buy wire prices.
150, how the toilet fixed to the floor, hit the screw with it? There is convergence at the base and pipeline, to buy what were sealed and the outside is better: the toilet was fixed with expansion screws. Convergence at the base and the inside of the pipe with a special sealant toilet. Out of white plastic with the deployment of white cement + water slurry. When the toilet is generally purchased with a special sealant.
151, buy materials, we must first calculate your approximate usage. To buy water when the material to do anyway, after thinking about a painting materials by sea chart in the end how many came out, so little trust in a moment the foreman, the result was that buy the water 5 meters, the actual use 27 copper head months, actually bought a 40, should the remaining 13, seven short of the actual remaining 6. Under repeated questioning of the foreman back from the other site Details of their pre-calculated circuit material, the calculated results and after comparing the request of the foreman: wire from 12 meters to 30 meters, cable 13 meters from 20 meters to the other, such as insulating tape, plug had great access was I correct ... ...
152, if there are old water pipes under the ground, in addition to switch hit, it tends to be damaged, do not hesitate to be the laying of new, do not save, to ensure safety .
153, bathroom walls that retraction of the glove do not waste space, and posted a very good very nice tile. Of course, that tile union trouble saying
154, do not use tile received positive side of the line angle to 45 degrees splicing bricklayer before grinding pretty, of course, you do not choose Tijuana workers lazy way to do things.
155, aluminum pipe, when installed must be sealed cement workers in the supervision of the construction standards in accordance to the hot water pipe Reserve space for expansion. Short plastic tube not closed strong, and loose some of good thing.
156, the bathroom floor if higher than the hall, the transition can be used to solve the door stone.
157, plus move the sewer pipe mouth, then the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.
158, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see the effect of significantly different .
159, buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.
160, the color of brick is hard to find satisfactory, and I did not find, however, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is indeed the bricklayer himself put forward good suggestions.
161, under the supervision of the ground water repellent to use is not in accordance with the requirements of my bricklayer but directly poured on the ground, it can even do! It is not the best yourself, do not bother but assured.
162, the slope of the bathroom floor before tiling to consider the good, the slope is not in accordance with national standard to achieve the effect of rapid drainage, and if you use a deodorant or a thin floor drain floor drain will be greatly increased drainage problems. Some people say that steep slope and pretty, I think it is nonsense. Instead larger slope can quickly run a clean water is very soothing thing.
163, the LG door with platinum point fire board, the effect is good, but might consider if we made the decoration finished door. The door by hand is not refined, for reference only.
164, sink big market brand-name price is not cheap, brand-name quality crazy bad.
165, the balcony door is best to use the same type of fire board. Balcony environment is harsher.
166, bathroom vanities and cabinets to do when they have to consider the size of basin lest good fit in the future.
167, the glass is heavy stuff, the best buy in the neighborhood, or first think of a good means of transport.
168, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.
169, matte paint is high and light is beautiful, do not listen to the painter, and if not brushed matte painter, said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not lying to you
170, insulating tape and Teflon tape in the store to buy another large supermarket was much better quality, and full weight, conversion down the price is not expensive.
171, if the re-decoration will be used instead of talc putty finished, no big reason is that finished product easy to use putty. Especially after the painter fired when their own experience diy - talc tone putty sick of it.
172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside the use, electrician recommended a new one on the interior, and now that he suggested this valuable. On the interior door is not bad, it really easy to use!
173, large decorating company directly to the workers on site clearance work may be more appropriate package, and better technology, tools, more
174, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.
175, the audience delicate pots pots than on stage, good-looking, good cleaning.
176, basin faucet with the audience to pay attention, taking into account the basin edge thickness, leading to the mouth longer.
177, the hole in front of the toilet installation is a big, large floor drain cover can fall off, if you have installed the toilet floor drain is not installed, do pay attention to floor drain cover, or the floor drain Ye Hao lid kept it up elsewhere.
178, buy silicone, then the absolute best all imports of GE, GE followed by Shanghai packaging. Of course, if very important place in the 7,8 element that can also be used, such as aluminum window frames with internal Jiu-level waste to plug the whole silica gel. However, all use the bathroom GE silicone kitchen, value for money!
179, triangular valves should not be omitted, and save much money, if the words of the triangle valve, triangle valve to be installed in advance of copper joints are not leaking, if not installed, then only the last copper fittings installed on the faucet to take over the child when it was installed to check whether the internal leakage, the total leakage to pressure some time to test it, and install internal and less safe if the lead.
180, even in the diary has been renovated to be done about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the realization of your ideas, to rely on them.
181, fitting the biggest problem is communication!
182, little place, kitchen cabinet door type designed, BH. L-type should be designed.
183, general decoration, decoration companies, excluding the formal management fees, taxes, fees accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.
184, go in the kitchen on the ground outside the pipe, that is, from home improvement to a time bomb, who say where Shashi Hou himself in trouble.
185, if the separate tube wear, but in a tank of great? Effects can endure
186, ask what the restaurant and living room are separated between the most cost-effective package Door, side package only 6 cm, or contaminated with white, height 2 m, was not large High crude.
187, strong and weak power transfer to each tube, to separate the best way, keep the distance of 10 cm or more, but it can be difficult, because most families in order to save costs and to open a slot. Weak audio line can penetrate the same pipe.
188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to no pungent odor. In fact, you are using a good wood core board, do not deal with furniture inside.
189, the cabinet can be 15 cm plates and wood core board, the back of the five available folders, Wuli. Package doors and Tizi use nine per cent. Different materials with different techniques.
190, PPR pipe not only for cold water pipes, but also for hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tubes together, so once installed suppression test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never rust, never leakage, green high water material.
191, paint board is good, the advantages of both wood and composite.
192, do not print for a long time on the wet artificial stone, unless you want to dry a printing surface; they should not be long-term wet cutting board on the table. Wet wood is sometimes fade; rub the stain with a steel ball, like hand squeeze pimples.
193, can use an ordinary gas meter in the cabinet door closed it? Need to use the shutter-type door it? Check regularly open air on the line.
194, clear contracting the tx Please note, we must verify the renovation team give you a list of materials. Their estimates may be me, I too believe that they, and the results of wires and line to buy is almost doubled.
195, the size of certain planned sanitary ware, the best sketch in advance, calculate the size.
196, students pay attention to the door to buy products, if you want to pursue results support the panel with the business package Door, then you may have to be Henzai knife it!
197, Re: installation of water pipes are put before the leader and basin, sink have bought?
not, just make sure where is the basin faucet, bathtub faucet, washing machine what's on the line leading, leading 99 percent sign and fell into the water are in line with international norms, as long as workers are not careless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. Tank to determine the amount of units before a good size, fitted units Haojiu Hang bought before, do not forget that the audience or on stage. Distance between hot and cold water pipes with cement tiles must be accurate before the closure of 15 cm, and must be parallel. If you have bought, it is best put something, such as sealed after the unload.
198, if an 8-core cable at the same time take the phone and network, will not interfere with each other it? Not. 1,2,3,6 hit cable module, 4,5 hit the phone module, and the other two easily. My experience was right: 10M by 1236 100M in fact used to have the speed to 10/100M that we will not feel any different. If a 8pin line, then the signal will cause some program-controlled switches on the network signal interference in the home environment generally will not have any problem. But rest assured that I can recommend such a route will leave separately to the margin, the network cable is very cheap that you say?
199, be sure to check the distribution box installed properly.
200, fitted bath and shower faucet lessons connected to the faucet pipe is embedded in the wall, and I repeatedly told them to size to get accurate, not to pretend not on time. The results left a hot and cold water is 15 cm spacing, can be hot and cold water pipes are not parallel, the result took a plumber just put on the force feeding. Yesterday discovered that my fb leading high-temperature coating device actually does get cracked. If we can first load leading to the first installed it. Leader should be bought first, then install hot and cold water pipes, tiling it. Oujia bought early leader, is Oujia master to buy.
Subscribe to:
Posts (Atom)